Skip to content
International Geothermal Association Conference Paper Database Live

Searches title, authors, abstract, keywords and session. Use "quotes" for an exact phrase.

Advanced search

All filled fields must match. Conference and year are added to the filters on the left.

Filters

Show filters
Conference
Year
–

1–9 of 9 papers

  1. Recent Geothermal Power Projects in Russia

    Grigory V. Tomarov, Alexander I. Nikolskiy, Valeriy N. Semenov, Andrey A. Shipkov · World Geothermal Congress · 2010 ·6. Case Histories

    … up-to-date technologies of geothermal electrical and heat power plant construction and maintenance, as well as power equipment engineering and manufacturing. The consistent increasing fossil fuel prices and the availability of a considerable number of …

    View paper: Recent Geothermal Power Projects in Russia PDF: Recent Geothermal Power Projects in Russia (2453KB)

  2. Factors Affecting the Capital Cost of Binary Power Plants

    Forsha, Michael D.; Nichols, Kenneth E. · Geothermal Resources Council Transactions · 1991 ·Economics; Binary cycle power generation; Working fluids; Po

    … and rejecting heat with a cooling tower is $1775/KW of net power output. The cost of a comparable ammonia plant is $1450/KW. If a spray pong is used instead of a cooling tower the cost is reduced to $1250/KW. These costs do not include the wells, geofluid …

    View paper: Factors Affecting the Capital Cost of Binary Power Plants Download unavailable

  3. The Economics of Geothermal Power in Saint Lucia, West Indies

    Barthelmy, Aloysius · Geothermal Resources Council Transactions · 1990 ·Economics; Energy markets; Power plant design and operation

    An economical comparison is made between geothermal power at Sulphur Springs, Soufriere, Saint Lucia and diesel generate power from a new diesel power station at Cul de Sac to the south of Castries. The comparison is over a 20 year period. The new diesel …

    View paper: The Economics of Geothermal Power in Saint Lucia, West Indies Download unavailable

  4. Repowering Back Pressure Turbines at the Los Humeros Geothermal Field

    Vega, Guillermo De La Torre · Geothermal Resources Council Transactions · 1994 ·Power plant design and operation

    View paper: Repowering Back Pressure Turbines at the Los Humeros Geothermal Field Download unavailable

  5. A Five-Phase Linear Workflow for Geothermal Power Project Development

    Hernandez, Jonathan A.; Robertson-Tait, Ann; · Geothermal Resources Council Transactions · 2023 ·Exploration; Drilling; Feasibility studies; Workflow

    View paper: A Five-Phase Linear Workflow for Geothermal Power Project Development Download unavailable

  6. The Mokai Geothermal Power Plant, New Zealand: Analysis of Performance During First Year of Operation

    Menzies, A. J.; Brown, P.; Searle, J.; King, R. · Geothermal Resources Council Transactions · 2001

    View paper: The Mokai Geothermal Power Plant, New Zealand: Analysis of Performance During First Year of Operation Download unavailable

  7. Geothermal Power Market Mobilization Initiative--Climate Change Action Plan

    Calvert, Stanley D. · Geothermal Resources Council Transactions · 1994 ·Economics; Energy markets; Energy policy

    View paper: Geothermal Power Market Mobilization Initiative--Climate Change Action Plan Download unavailable

  8. Current Status of Geothermal Development in Honduras

    Wilmer HENRIQUEZ · World Geothermal Congress · 2020 ·Country Updates

    … and generation of electricity. In 2017, the first electric power generation plant in Honduras came into operation, with a capacity of 35 MW, which is located in the western part of the country. This plant is currently delivering to the National …

    View paper: Current Status of Geothermal Development in Honduras PDF: Current Status of Geothermal Development in Honduras (1061 KB)

  9. Greece, Milos Island Geothermal Project

    Delliou, E. E. · Geothermal Resources Council Transactions · 1990 ·Exploration; Power plant design and operation; Injection; En

    … Heavy Industries of Japan under a contract with Public Power Corporation of Greece. Due to high salinity of the geothermal fluid, unforeseen problems (scaling mainly) arised in both steam and brine cycles. As a consequence, the operation (trial mainly) …

    View paper: Greece, Milos Island Geothermal Project Download unavailable

Papers are freely accessible. Copyright remains with the authors and conference organisers as stated on each paper.

IGA Conference Paper Database · New search