DiPippo, Ronald; Avelar, Eileen M.
·
Geothermal Resources Council Transactions
·
1979
·Power plant design and operation; Hybrid power generation; D
The principles governing the design of geothermal preheat and fossil superheat hybrid plants are reviewed. Limitations of these designs are pointed out and compound hybrid systems are proposed. Compound hybrid plants are well matched to geothermal resources …
View paper: Compound Hybrid Geothermal-Fossil Power Plants
Download unavailable
-
Tleimat, B. W.; Laird, A. D. K.
·
Geothermal Resources Council Transactions
·
1978
·Working fluids; Binary cycle power generation
Abstract not available
View paper: Investigation of Heat Transfer Coefficients of Working Fluids in Geothermal Power Cycles
Download unavailable
-
Azam Thatte, Doug Simpkins, Mauricio Rivas, Lev Ring, Cindy Taff
·
World Geothermal Congress
·
2026
·Advances in Power Plants - Part 2
… significant parasitic load and reduces efficiency and net power output from the geothermal power plant. To remedy this issue, this paper presents a novel pressure recovery system using Rotary Pressure Exchanger (RPX) to recover up to 95% of the pressure …
View paper: Novel Pressure Recovery System for Increasing Efficiency of Geothermal Power Plants
PDF: Novel Pressure Recovery System for Increasing Efficiency of Geothermal Power Plants
-
Taguchi, Kosuke; Makimoto, Shizuka; Ishii, Daisuke
·
Geothermal Resources Council Transactions
·
2010
·Power plant design and operation; Steam scrubbers; Brine che
… has recently been deployed at the Nga Awa Purua Geothermal Power Station. The rated 140MW NAP plant employs a triple flash steam separation and steam purification system. The plant utilizes conventional mechanical separation and scrubbing water injection …
View paper: Application of a Steam Purity Monitoring System at the Triple Flash Nga Awa Purua Geothermal Power Station in New Zealand
Download unavailable
-
Sifford, Alex
·
Geothermal Resources Council Transactions
·
1992
·Databases; Power plant design and operation; Economics
… available public information documenting geothermal power plants in the United States. ODOE did this work for Bonneville Power Administration (BPA). Work began in early 1991 and was complete in March 1992. Database and example report files were sent …
View paper: Geothermal Power Plant Database Summary Report
Download unavailable
-
Barthelmy, Aloysius
·
Geothermal Resources Council Transactions
·
1990
·Economics; Energy markets; Power plant design and operation
An economical comparison is made between geothermal power at Sulphur Springs, Soufriere, Saint Lucia and diesel generate power from a new diesel power station at Cul de Sac to the south of Castries. The comparison is over a 20 year period. The new diesel …
View paper: The Economics of Geothermal Power in Saint Lucia, West Indies
Download unavailable
-
Hibara, Yutaka; Araki, Koichi; Tazaki, Shunsei; Kondo, Takeshi
·
Geothermal Resources Council Transactions
·
1990
·Power plant design and operation; Equipment design; Turbines
In order to cope with the variety of needs for geothermal power plants, Mitsubishi Heavy Industries has been making continuous efforts to develop the product to match with the needs. In this paper, the following recent technologies developed and being …
View paper: Recent Technology of Geothermal Power Plant
Download unavailable
-
Leibowitz, H. M.; Markus, D. W.
·
Geothermal Resources Council Transactions
·
1990
·Power plant design and operation; Binary cycle power generat
The economics of geothermal power using liquid dominated resources in the 300°F to 350°F (149°C to 177°C) range is substantially improved using an ammonia/water Kalina cycle, designated as System 12 (KCS12). The best features of flash steam systems and the …
View paper: Economic Performance of Geothermal Power Plants Using the Kalina Cycle Technology
Download unavailable
-
Rosenblatt, J. H.; Saulson, S. H.
·
Geothermal Resources Council Transactions
·
1990
·Single flash; Power plant design and operation; Flash steam
Single flash geothermal power plants are relatively inefficient compared to their higher temperature "cousins." The Low Temperatures Engine System (LTES) is a novel cycle applicable to many types of power plants. The LTES has been analyzed as an add on …
View paper: Increasing Electric Power Output from Single-Flash Geothermal Plants
Download unavailable
-
Schoonmaker, James L.; Maricle, Mark F.
·
Geothermal Resources Council Transactions
·
1990
·Power plant design and operation; Power grids
The California Energy Company, Inc. (CECI) and Mission Power Engineering Company (MPE) have completed engineering and construction, and began operation of four additional geothermal generating units as part of the Coso Geothermal Project. These units are …
View paper: Design and Construction of the Coso Geothermal Power Projects
Download unavailable
-
Grande, M. G.; Enedy, S. L.
·
Geothermal Resources Council Transactions
·
1989
·Reservoir management; Injection; Power plant design and oper
… production decline rates experience by Northern California Power Agency at the Geysers, NCPA instituted a feasibility study of the power plant alternatives for improving and extending reservoir performance. The study found that the most attractive …
View paper: Power Plant Operating Alternatives for Improving and Extending Reservoir Performance at The Geysers
Download unavailable
-
Phair, Kenneth A.
·
Geothermal Resources Council Transactions
·
1989
·Power plant design and operation; Operations management
The Bear Canyon 20 MW Power Plant was designed around numerous modular equipment packages. This modular concept resulted in significant schedule savings in design, construction, and startup. The use of modular equipment contributed to the completion of the …
View paper: Modular Design and Construction at the Bear Canyon 20 MW Power Plant
Download unavailable
-
Schoonmaker, James L.
·
Geothermal Resources Council Transactions
·
1989
·Power plant design and operation; NCG; Operations management
The California Energy Company, Inc. (CECI) and Mission Power Engineering Co. (MPE) formed a team in 1987 to develop Units 2 through 9 of the COSO Project. Each of these units are 30 MW nominal, dual flash design. They are located on four sites in the COSO …
View paper: The Coso Geothermal Power Projects
Download unavailable
-
Urbank, Karl F.
·
Geothermal Resources Council Transactions
·
1989
·Power plant design and operation; Permitting; Operations man
The West Ford Flat 27 megawatt power plant is one of two Geysers plants constructed by Geysers Geothermal Company during 1987 and 1988. The project began in May 1987 with the acquisition of a PG&E Power Purchase Agreement from SAI Geothermal. Construction …
View paper: Design and Construction of the West Ford Flat Power Plant at The Geysers
Download unavailable
-
Bell, D.; Thomas, D.
·
Geothermal Resources Council Transactions
·
1988
·Power plant design and operation; Corrosion; Scaling; Power
… of Hawaii (RCUH) completed the third overhaul of the HGP-A power plant during October and November 197. The 3 MW power plant was developed jointly y the Federal government and the State of Hawaii and began operation in 1982 in order to demonstrate the …
View paper: Report on the October 1987 Hawaiian HGP-A Power Plant Overhaul and Reservoir Production Data
Download unavailable
-
Bell, D.
·
Geothermal Resources Council Transactions
·
1988
·Power plant design and operation; Injection; Effluent abatem
… plan to construct Hawaii's first commercial geothermal power plant - a 25 MW (net) twin turbine generator facility locat3ed in the east rift zone of the Kilauea Volcano in the southeastern portion of the Big Island of Hawaii.
View paper: Puna Geothermal Venture's Plan for a 25 MW Commercial Geothermal Power Plant on Hawaii's Big Island
Download unavailable
-
Gonsalves, David; Knox, Lauri A.
·
Geothermal Resources Council Transactions
·
1988
·Power plant design and operation
Many more geothermal power plants are expected to be built in the United States in the near future. The owners and designer of these plants are increasingly realizing the importance of operations and maintenance to successful plants. Various design features …
View paper: Geothermal Power Plant Design with Operation and Maintenance in Mind
Download unavailable
-
Kaplan, U.; Krieger, Z.; Dillenberger, A.
·
Geothermal Resources Council Transactions
·
1987
·Power plant design and operation
… and operation of the Steamboat Springs 5 MW Geothermal Power Plant. The elements discussed herein include the air coolers, the subcritical power cycle and the control system for automatic operation. Additionally, the unique features of the power modules …
View paper: Innovative Design, Construction and Operation of the Steamboat 5 MW Geothermal Power Plant at Steamboat Springs, Washoe County, Nevada
Download unavailable
-
Hibara, Yutaka; Ikegami, Masatoshi; Saito, Shoujirou
·
Geothermal Resources Council Transactions
·
1986
·Power plant design and operation; Flash steam power generati
The 52 MW Heber geothermal power plant was completed in August, 1985 in Imperial Valley, California and has been successfully operating since then. This power plant is not only the first large capacity hot water type geothermal power plant in U.S.A but also …
View paper: The Heber Double Flash Geothermal Power Plant
Download unavailable
-
McKay, Gary D.
·
Geothermal Resources Council Transactions
·
1986
·Economics; Power plant design and operation
The profitability of a geothermal power plant is directly affected by its thermal performance. Therefore, a method has been developed for determining the uncertainty in calculated power plant performance parameters and finding the most economical level of …
View paper: A Method for Evaluating Performance Uncertainty and Optimizing Data Accuracy in Geothermal Power Plants
Download unavailable
-
Nichols, Kenneth E.
·
Geothermal Resources Council Transactions
·
1986
·Power plant design and operation; Working fluids
Modular wellhead power plants, based on the organic Rankine cycle, have proven reliability with high utilization of the available resource. The power cycle is adaptable to water or steam temperatures of 180°F to 350°F. The power plant working fluid is a …
View paper: Wellhead Power Plants and Operating Experience at Wendel Hot Springs
Download unavailable
-
Van der Mast, Victor; Goldman, Eugene; Soo-Hoo, Randall
·
Geothermal Resources Council Transactions
·
1986
·Power plant design and operation; Scrubbers; Steam separator
… attention needs to be paid to steam purity in geothermal power plants. In many cases, inadequate steam purity leads to performance degradation, turbine damage, and economic loss. Recent geothermal power plant experiences are discussed along with field test …
View paper: Steam Purity for Geothermal Power Plants
Download unavailable
-
Outten, Thomas W.; Tanner, Alvin L.; Linam, Paul A.; Norman, William M.
·
Geothermal Resources Council Transactions
·
1985
·Power plant design and operation; Binary cycle power generat
… costs were developed for wellhead binary cycle geothermal power plants. Known geothermal resources were characterized and three were selected as typical of the geothermal resources most likely to be developed for utility use within the next decade. Two …
View paper: Wellhead Binary Cycle Geothermal Power Plant Evaluation
Download unavailable
-
Kindle, Cecil H.; Shannon, Donald W.; Robertus, Robert J.; Pierce, Debra D.; Sullivan, Robert G.
·
Geothermal Resources Council Transactions
·
1985
·Scaling; Corrosion; Power plant design and operation; Equipm
… should be usable even in some low capital wellhead type power plants.
View paper: Plant Monitoring Techniques and Second Generation Designs
Download unavailable
-
Stiger, Robert R.
·
Geothermal Resources Council Transactions
·
1985
·Magma energy; Power plant design and operation; Economics; W
… shallow magma bodies. Conventional water based, dual flash power plants that use a tube within a tube well completion were used. The preliminary results of the study indicated that the magma energy extraction is in a range (100-200 mills/kw.hr) that makes it …
View paper: Power Plant Conceptual Design for Magma Energy Extraction
Download unavailable