Wendt, Daniel; Mines, Greg
·
Geothermal Resources Council Transactions
·
2011
·Power plant design and operation; Binary cycle power generat
Air-cooled binary plants are designed to provide a specified level of power production at a particular air temperature. Nominally this air temperature is the annual mean or average air temperature for the plant location. This study investigates the effect …
View paper: Effect of Ambient Design Temperature on Air-Cooled Binary Plant Output
Download unavailable
-
Bouche, Douglas P.
·
Geothermal Resources Council Transactions
·
2009
·Power plant design and operation
… that careful consideration be given to designing the plant that represents a good fit with respect to the plant’s reservoir, area surface conditions, and the environment. This paper summarizes some important design considerations that should be made in …
View paper: Understanding Plant External Conditions When Designing Geothermal Power Plants--Some Important Considerations
Download unavailable
-
Phair, Kenneth A.
·
Geothermal Resources Council Transactions
·
1989
·Power plant design and operation; Operations management
The Bear Canyon 20 MW Power Plant was designed around numerous modular equipment packages. This modular concept resulted in significant schedule savings in design, construction, and startup. The use of modular equipment contributed to the completion of the …
View paper: Modular Design and Construction at the Bear Canyon 20 MW Power Plant
Download unavailable
-
Fesmire, Vincent R.
·
Geothermal Resources Council Transactions
·
1985
·Power plant design and operation; Turbines; Power plant cool
Reliability through design of the Sante Fe Geothermal Plant No. 1 is presented. Even though it has two turbine generators it is a single plant incorporating dual and shared systems, not two separate plants. There are dual turbine generators and related …
View paper: Reliability Through Design: The Santa Fe Geothermal Plant No. 1
Download unavailable
-
Tucker, Robert E.; Ward, R. F.
·
Geothermal Resources Council Transactions
·
1982
·Power plant design and operation; Turbines; Condensers
… is currently in the design phase of a geothermal power plant in the Geysers area of Northern California. Oxy plans to own and operate both the well field and the power plant. This is the first time in the Geysers that a resource developer has elected to …
View paper: Occidental Geothermal No. 1: An Innovative Plant Design
Download unavailable
-
Urbank, Karl F.
·
Geothermal Resources Council Transactions
·
1989
·Power plant design and operation; Permitting; Operations man
The West Ford Flat 27 megawatt power plant is one of two Geysers plants constructed by Geysers Geothermal Company during 1987 and 1988. The project began in May 1987 with the acquisition of a PG&E Power Purchase Agreement from SAI Geothermal. Construction …
View paper: Design and Construction of the West Ford Flat Power Plant at The Geysers
Download unavailable
-
Basile, Paolo; Favaro, Lorenzo; Mazzoni, Tiziana; Brogi, Roberto; Xodo, Luca; Thompson, William
·
Geothermal Resources Council Transactions
·
2023
·Popwer plant design and operation; Feasibility studies; Subm
View paper: Feasibility Analysis, Design, and Authorization of a Zero-Emission Geothermal Power Plant in Italy Case Study: Casa Del Corto Project
Download unavailable
-
Hanifah Bagus SULISTYARDI
·
World Geothermal Congress
·
2020
·Power Generation
Lumut Balai Geothermal Power Plant is located in South Sumatra province, Indonesia. This hydrothermal system has the power source that is coming from the liquid dominated reservoir laid on about 3000 meter below surface. The power output of 1 x 55 MW is …
View paper: Final Design for Construction Phase of Lumut Balai Geothermal Power Plant, Indonesia
PDF: Final Design for Construction Phase of Lumut Balai Geothermal Power Plant, Indonesia (744 KB)
-
Hanifah Bagus SULISTYARDI
·
World Geothermal Congress
·
2015
·Power Generation
Lumut Balai Geothermal Power Plant Project is a part of Power Plant Accelerated Development using Renewable Energy as per Ministry of Energy and Mineral Resources (MEMR) Regulation No. 01 of 2012. This policy was taken by Government of Indonesia to increase …
View paper: An Update on The Basic Design of Lumut Balai Geothermal Power Plant, Indonesia
PDF: An Update on The Basic Design of Lumut Balai Geothermal Power Plant, Indonesia (455 KB)
-
Budisulistyo, Denny ., Southon, Michael . and Krumdieck, Susan
·
New Zealand Geothermal Workshop
·
2014
·Geothermal Engineering - Production and Management
In this study, a model of a binary geothermal power plant has been developed in Aspen software and validated with the real data from Chena binary geothermal power plant. The validated model is used to investigate the effect of heat exchanger design on Return …
View paper: The Effect of Heat Exchanger Design On The Return On Investment Of A Geothermal Power Plant
PDF: The Effect of Heat Exchanger Design On The Return On Investment Of A Geothermal Power Plant (324 KB)
-
Eric Wolters
·
New Zealand Geothermal Workshop
·
2013
… components from corrosion during the life of the plant. These protection measures are not confined to material selection. The presence of H2S in the atmosphere gives rise to a number of building, building services, control system and electrical …
View paper: Peculiarities of Electrical Design in Geothermal Power Plants
PDF: Peculiarities of Electrical Design in Geothermal Power Plants (1 MB)
-
Douglas P. Bouche
·
World Geothermal Congress
·
2010
·26. Power Generation
Geothermal power plant designs are unique when compared to conventional power plants, and design features among them can differ significantly. Key technical considerations for proper plant design include reservoir conditions (production/injection …
View paper: Technical Considerations for Geothermal Power Plant Designs
PDF: Technical Considerations for Geothermal Power Plant Designs (31KB)
-
Stephanie Frick, Stefan Kranz, Ali Saadat
·
World Geothermal Congress
·
2010
·26. Power Generation
The contribution of geothermal binary power plants to the energy system is based on the provision of net electricity. That is defined by the produced gross electricity from which the auxiliary power to run power consuming components in the different parts of …
View paper: Holistic Design Approach for Geothermal Binary Power Plants with Optimized Net Electricity Provision
PDF: Holistic Design Approach for Geothermal Binary Power Plants with Optimized Net Electricity Provision (1709KB)
-
R. Gordon Bloomquist and B. Alexander Sifford III
·
World Geothermal Congress
·
1995
·SECTION 3 ? Geothermal Energy in the National Energy Policy
… early 1980s. The design and operation of geothermal power plants continues to evolve, reflecting changes in power sales arrangements, legislative and performance incentives, environmental awareness, and regulation. These changes are clearly evident in plant …
View paper: Evolving Power Plant Designs Prepare American Geothermal Industry for the 21st Century
PDF: Evolving Power Plant Designs Prepare American Geothermal Industry for the 21st Century
-
J. UWERA, R. ITOI, S. JALILNASRABADY, K. KOJIMA
·
New Zealand Geothermal Workshop
·
2016
·5.2
The Tatara binary geothermal power plant is a small scale plant located in Beppu, Oita prefecture, Kyushu Island, Japan, with installed capacity of 70 kW. This plant started operation in August 2014 using geothermal fluid at about 106oC from geothermal well …
View paper: Optimization and Design of Tatara Binary Geothermal Power Plant in Beppu, Japan
PDF: Optimization and Design of Tatara Binary Geothermal Power Plant in Beppu, Japan (719KB)
-
Rojas, Paul Moya; DiPippo, Ronald
·
Geothermal Resources Council Transactions
·
2006
·Power Plant design and operation; Binary cycle power generat
… and after the addition of Unit 5, a bottoming binary power plant. The early planning and design alternatives for Unit 5 are discussed. The bids and the selection criteria are presented. Details of the final design are presented. The unique asymmetrical …
View paper: Miravalles Unit 5: Planning and Design
Download unavailable
-
Outten, Thomas W.; Tanner, Alvin L.; Linam, Paul A.; Norman, William M.
·
Geothermal Resources Council Transactions
·
1985
·Power plant design and operation; Binary cycle power generat
… were developed for wellhead binary cycle geothermal power plants. Known geothermal resources were characterized and three were selected as typical of the geothermal resources most likely to be developed for utility use within the next decade. Two wellhead …
View paper: Wellhead Binary Cycle Geothermal Power Plant Evaluation
Download unavailable
-
Seesee, T. A.; Wie, J. M.; Richmond, H. O.; Snyder, N. W.
·
Geothermal Resources Council Transactions
·
1985
·Power plant design and operation; Clarification; Flash steam
… construction in two phases of a net 60 MW geothermal power plant and field development of geothermal wells located near Niland, Imperial County, California. The NGEP has progressed through the conceptual, preliminary and detailed engineering phase. The …
View paper: Process Design of Niland Geothermal Energy Program
Download unavailable
-
Cerini, D. J.; Diddle, C. P.; Gonser, W. C.
·
Geothermal Resources Council Transactions
·
1984
·Power plant design and operation; Hybrid power generation; T
… Petroleum Company began preliminary design of a power plant for Desert Peak in Churchill County, Nevada. Like all geothermal resources and projects Desert Peak is unique and required careful consideration of existing process schemes and design …
View paper: Project Development Desert Peak 9 MW Power Plant
Download unavailable
-
Hlinak, A. J.; Lobach, J. L.; Nichols, K. E.
·
Geothermal Resources Council Transactions
·
1981
·Heat exchangers; Isobutane; Power plant design and operation
A 500 kw geothermal power plant utilization direct contact hear exchange (DCHX) between geothermal brine and an isobutane working fluid is currently operating at the East Mesa test facility. The pilot plant program was initiated to determine the feasibility …
View paper: Operational and Field Test Results from the 500 kW Direct Contact Pilot Plant at East Mesa
Download unavailable
-
DiPippo, Ronald; Avelar, Eileen M.
·
Geothermal Resources Council Transactions
·
1979
·Power plant design and operation; Hybrid power generation; D
… design of geothermal preheat and fossil superheat hybrid plants are reviewed. Limitations of these designs are pointed out and compound hybrid systems are proposed. Compound hybrid plants are well matched to geothermal resources which produce mixtures of …
View paper: Compound Hybrid Geothermal-Fossil Power Plants
Download unavailable
-
Mines, Greg L.
·
Geothermal Resources Council Transactions
·
2002
·Power Cycles and Conversion; Binary cycle power generation;
View paper: Evaluation of the Impact of Off-Design Operation on an Air-Cooled Binary Power Plant
Download unavailable
-
DiPippo, Ronald; Vrane, David R.
·
Geothermal Resources Council Transactions
·
1991
·Power plant design and operation; Flash steam power generati
… in geothermal energy conversion systems; a double flash plant with an interstage reheater. Intended for use with two phase gathering systems, the new plant can generate over six percent more output than an optimized double flash plant, depending on the …
View paper: A Double-Flash Plant with Interstage Reheat: Thermodynamic Analysis and Optimization
Download unavailable
-
Nichols, Kenneth E.
·
Geothermal Resources Council Transactions
·
1986
·Power plant design and operation; Working fluids
Modular wellhead power plants, based on the organic Rankine cycle, have proven reliability with high utilization of the available resource. The power cycle is adaptable to water or steam temperatures of 180°F to 350°F. The power plant working fluid is a …
View paper: Wellhead Power Plants and Operating Experience at Wendel Hot Springs
Download unavailable
-
Dominguez A., Bernardo
·
Geothermal Resources Council Transactions
·
1981
·Exploration; Power plant design and operation; Flash steam p
… excellent results, that for 1979, the capacity of the Main Plants was increased, with the turbines 3 and 4, similar to the first ones, reaching the total of 150,000 Kw, for this year turbine number 5 should enter the system of low pressure which would …
View paper: Brief Commentaries of the Generation in the Main Plant in Cerro Prieto
Download unavailable