  1. FLOW MODEL AND PRESSURE DISTRIBUTION IN THE RE-INJECTION PIPELINE AHUACHAP¡N-CHIPILAPA, EL SALVADOR

    Julio E. Quijano, JosÈ L. Henriquez and Jorge A. Burgos · Stanford Geothermal Workshop · 2001 ·Production/injection

    In the Ahuachap·n Geothermal Field the re-injection pipeline used to connect the flasher unit with the injection zone in Chipilapa has a total length of 6.02 km. The main flow is carried by a 24" pipe diameter of 4647 length until the Ch-7bis pad where it is …

    View paper: FLOW MODEL AND PRESSURE DISTRIBUTION IN THE RE-INJECTION PIPELINE AHUACHAP¡N-CHIPILAPA, EL SALVADOR PDF: FLOW MODEL AND PRESSURE DISTRIBUTION IN THE RE-INJECTION PIPELINE AHUACHAP¡N-CHIPILAPA, EL SALVADOR (67KB)

  2. Determination of the Optimal Pipe Support Spans for Geothermal Pipelines

    Kevin J. Koorey · World Geothermal Congress · 2000 ·Exploration and Development

    … of the supports on geothermal two phase, steam and water pipelines will produce construction cost savings. Equations for calculating the maximum span for design code ASME B31.1 and continuous pipelines are given. A method for optimising the pipe spans on a …

    View paper: Determination of the Optimal Pipe Support Spans for Geothermal Pipelines PDF: Determination of the Optimal Pipe Support Spans for Geothermal Pipelines (156 B)

  3. GeoSteamNet: 1. Thermodynamic Data for Numerical Simulation of Steam Flow in a Pipeline Network of Geothermal System

    Mahendra P. Verma · Stanford Geothermal Workshop · 2010 ·Modeling

    … computed. The grid can be saved in a file for its reuse. A linear interpolation within an individual phase, vapor or liquid is implemented to calculate the properties at a given value of temperature and pressure. In an Excel worksheet the enthalpy of one …

    View paper: GeoSteamNet: 1. Thermodynamic Data for Numerical Simulation of Steam Flow in a Pipeline Network of Geothermal System PDF: GeoSteamNet: 1. Thermodynamic Data for Numerical Simulation of Steam Flow in a Pipeline Network of Geothermal System (368KB)

  4. An Update on the Geothermal Data Repository's Data Standards and Pipelines: Geospatial Data and Distributed Acoustic Sensing Data

    Taverna, Nicole; Weers, Jon; Porse, Sean; Anderson, Arlene; Frone, Zachary; Holt, Emily · Geothermal Resources Council Transactions · 2023 ·GIS; Databases; Machine learning

    View paper: An Update on the Geothermal Data Repository's Data Standards and Pipelines: Geospatial Data and Distributed Acoustic Sensing Data Download unavailable

  5. Improving the Accessibility and Usability of Geothermal Information with Data Lakes and Data Pipelines on the Geothermal Data Repository

    Weers, Jon; Porse, Sean; Huggins, Jay; Rossol, Michael; Taverna, Nicole · Geothermal Resources Council Transactions · 2021 ·Machine learning; Drilling; FORGE

    View paper: Improving the Accessibility and Usability of Geothermal Information with Data Lakes and Data Pipelines on the Geothermal Data Repository Download unavailable

  6. Testing of cyclone separators and steam pipelines for separation and scrubbing performance

    T. Misa, E. Mroczek · New Zealand Geothermal Workshop · 2017 ·Session 5.1: Production

    Testing for separation and scrubbing performance was undertaken on Intermediate Pressure (IP) and Low Pressure (LP) steam systems of a geothermal steamfield and power station. Testing was completed at a number of process conditions to determine what operating …

    View paper: Testing of cyclone separators and steam pipelines for separation and scrubbing performance PDF: Testing of cyclone separators and steam pipelines for separation and scrubbing performance (866KB)

  7. Measuring Steam Impurities in a Geothermal Pipe Line System Using Real Time Instrumentation

    Stockman, Edwin J.; McLean, Douglas; Mathur, Ravi; Jonas, Otakar; Hirtz, Paul · Geothermal Resources Council Transactions · 1993 ·Steam quality; Brine chemistry; Equipment design

    View paper: Measuring Steam Impurities in a Geothermal Pipe Line System Using Real Time Instrumentation Download unavailable

  8. Some Investigations on Decline in Dora-1 Brine Flow Rate, Case Study: AS-1 Production Well

    Murat KARADAS, Umran SERPEN, Niyazi AKSOY · Stanford Geothermal Workshop · 2014 ·General

    … power plant are investigated. All operations on wells, pipe lines and the power plant from past to present are investigated. An inverse relationship was discovered between pressure of brine line and the brine mass flow rate. Pressure differences between …

    View paper: Some Investigations on Decline in Dora-1 Brine Flow Rate, Case Study: AS-1 Production Well PDF: Some Investigations on Decline in Dora-1 Brine Flow Rate, Case Study: AS-1 Production Well (1268 KB)

  9. Calcite Deposition in Two-Phase Lines in Bacman Geothermal Production Field, Philippines

    Ramonito P. Solis, Jimmy J. Fragata, Edwin L. Bondoc and Fidel S. See · World Geothermal Congress · 2000 ·Power Generation

    … of OP-5DA and OP-6D simultaneously increased, approaching pipe design limits. All available data show the presence of a blockage although its location could not be ascertained while the wells were supplying fluids. During inspection while the power plant …

    View paper: Calcite Deposition in Two-Phase Lines in Bacman Geothermal Production Field, Philippines PDF: Calcite Deposition in Two-Phase Lines in Bacman Geothermal Production Field, Philippines (301 B)

  10. 'Hydrogen Anywhere' from Deep Hot Dry Rock AGS Removes Difficult Pipelining Hydrogen Barrier and Enables 'Clean' Growth

    Leighty, William C. · Geothermal Resources Council Transactions · 2023 ·Closed loop power generation; Hydrogen; Transmission

    View paper: 'Hydrogen Anywhere' from Deep Hot Dry Rock AGS Removes Difficult Pipelining Hydrogen Barrier and Enables 'Clean' Growth Download unavailable

  11. Scale in Steam Transmission Lines at the Kamojang Geothermal Field

    Syafei Sulaiman, Ardi Suwana, Gustian Ruslan and Surachman Suari · World Geothermal Congress · 1995 ·SECTION 11 - Corrosion and Scaling

    Kamojang Geothermal Field has been supplying steam for the 140 Power Plant since 1982. Although this field produces only saturated steam with no water, scale build up has been observed at places near the wellheads. Detailed investigations during the last two …

    View paper: Scale in Steam Transmission Lines at the Kamojang Geothermal Field PDF: Scale in Steam Transmission Lines at the Kamojang Geothermal Field

  12. The Santa Rosa--Geysers Recharge Project, Geysers Geothermal Field, California

    Stark, Mitchel A.; Box, W. Tom, Jr.; Beall, Joseph J.; Goyal, Keshav P.; Pingol, Alfonso S. · Geothermal Resources Council Transactions · 2005 ·HDR/EGS; Geothermal overviews; Recharge; Injection; Pipeline

    View paper: The Santa Rosa--Geysers Recharge Project, Geysers Geothermal Field, California Download unavailable

  13. Drip-Pot Applications

    Jung, Douglas B. · Geothermal Resources Council Transactions · 1995 ·Pipelines; Catchpots; Two phase flow; Equipment design

    View paper: Drip-Pot Applications Download unavailable

  14. New Material -- Copolymer Carbon Composite (CCC) for Hydrothermal Piping

    Wehlage, Edward F. · Geothermal Resources Council Transactions · 1980 ·Pipelines; Direct use

    Non-metallic materials are attracting interest in geothermal application while plastic, plastic-cement and other combinations are proposed. The author suggests a new development with a system of high strength graphite fiber reinforcement in polymerized cement …

    View paper: New Material -- Copolymer Carbon Composite (CCC) for Hydrothermal Piping Download unavailable

  15. Connecting a new geothermal field to an established power plant: Expansion of production at Hellisheiði.

    Gunnlaugur Brjánn Haraldsson, Gunnar Gunnarsson, Kolbrún Ragna Ragnarsdóttir · World Geothermal Congress · 2023 ·Power Generation

    … Hellisheiði power plant, resulting in the longest steam pipeline that has been built in Iceland. In this paper the challenges of connecting the Hverahlíð field are described. A separation station was constructed at the Hverahlíð site as well as two …

    View paper: Connecting a new geothermal field to an established power plant: Expansion of production at Hellisheiði. PDF: Connecting a new geothermal field to an established power plant: Expansion of production at Hellisheiði. (0,83 MB)

  16. The Steamfield Process Design and Optimisation Tool (SPDOT)

    C. Umanzor, S.J. Zarrouk · New Zealand Geothermal Workshop · 2022 ·Session 2.3 - PRODUCTION & MANAGEMENT 1

    … of a steamfield configuration, such as primary separators, pipe sections, condensate drain pots, scrubbers, and demisters. The program calculates a range of physical and thermofluids processes for each standalone block, including pressure drop, heat …

    View paper: The Steamfield Process Design and Optimisation Tool (SPDOT) PDF: The Steamfield Process Design and Optimisation Tool (SPDOT) (753KB)

  17. Comprehensive Comparison Between Using the Main Big Separator in the Power Plant Site and Two Small Separator in the Near of Wells in Each Sites for 25 MWe Power Plant in Sabalan, Iran

    Iraj GHADERI, Elham HASSIBI, Mehdi FALLAHZADEH · World Geothermal Congress · 2020 ·Power Generation

    … brine water reinjection at wells on pads B and C. Then pipelines will be designed for transmission two-phase flow from site D and E to site A in one line and separate in Site A with a big separator then assume one separator in each site, D and E, than …

    View paper: Comprehensive Comparison Between Using the Main Big Separator in the Power Plant Site and Two Small Separator in the Near of Wells in Each Sites for 25 MWe Power Plant in Sabalan, Iran PDF: Comprehensive Comparison Between Using the Main Big Separator in the Power Plant Site and Two Small Separator in the Near of Wells in Each Sites for 25 MWe Power Plant in Sabalan, Iran (2488 KB)

  18. Sulfide Scales Downhole in Well RN-22 Reykjanes High-temperature Area

    Vigdis HARDARDOTTIR, Nicole HURTIG · World Geothermal Congress · 2020 ·Corrosion and Scaling

    … is intense. Material collected from the bottom of the pipe is mainly composed of rounded fragments of sulfides, clusters of sulfides, mainly sphalerite, and rounded rock samples indicating that the material had fallen from the liner above. The material …

    View paper: Sulfide Scales Downhole in Well RN-22 Reykjanes High-temperature Area PDF: Sulfide Scales Downhole in Well RN-22 Reykjanes High-temperature Area (1250 KB)

  19. Modelling a Geothermal Steam Field to Evaluate Well Capacities and Assist Operational Decisions

    Andrew MARSH · World Geothermal Congress · 2015 ·Production Engineering, Steam Gathering Systems

    … geothermal reservoir usually feeds into a network of pipelines to gather and distribute the geothermal fluid to the various connected plant equipment. By careful analysis of the measurements collected throughout the system a deeper understanding of …

    View paper: Modelling a Geothermal Steam Field to Evaluate Well Capacities and Assist Operational Decisions PDF: Modelling a Geothermal Steam Field to Evaluate Well Capacities and Assist Operational Decisions (408 KB)

  20. Case Study of Calcium Carbonate Scale at EGS and Hot Spring Binary System

    Norio YANAGISAWA · World Geothermal Congress · 2015 ·Corrosion and Scaling

    … systems calcium carbonate scale precipitate in well, pipeline and heat exchanger. For example, at Hijiori EGS test site, calcium carbonate scale on pipeline of HDR-2 rapid increased after thermal breakthrough of reservoir. To decrease scaling, we try …

    View paper: Case Study of Calcium Carbonate Scale at EGS and Hot Spring Binary System PDF: Case Study of Calcium Carbonate Scale at EGS and Hot Spring Binary System (811 KB)

  21. TURBINE SCALING

    C.Morris, E.Mroczek · New Zealand Geothermal Workshop · 2015 ·Session 5A: Reservoir Engineering/Modelling

    … from separator breakdown. This is normally removed by pipeline scrubbing or demisters but these are not totally effective. Low drainpot efficiency exacerbates the problem. A sample of wet steam collected by isokinetic probes is rarely representative of …

    View paper: TURBINE SCALING PDF: TURBINE SCALING (250KB)

  22. Ahuachapán Reinjection System Ensurement

    Juan Carlos Ábrego Castillo · World Geothermal Congress · 2010 ·23. Injection Technology

    … of new pump in the power station and new reinjection pipeline. Pumping surface facility numerical model developed with well injectivity behavior with time have shown that for a 5 year period, brine disposal with a moderate power station pumping …

    View paper: Ahuachapán Reinjection System Ensurement PDF: Ahuachapán Reinjection System Ensurement (234KB)

  23. Alternative Energy Carriers for Remote Geothermal Sources

    Robert R. Dickinson, David Battye, Valerie Linton, Peter Ashman, Graham Nathan · Australian Geothermal Energy Conference · 2009

    … much closer to the national Compressed Natural Gas (CNG) pipeline network than they are to the national electricity grid. This paper presents an assessment of the prospect of using large-scale electrolysis to convert the output of a geothermal …

    View paper: Alternative Energy Carriers for Remote Geothermal Sources PDF: Alternative Energy Carriers for Remote Geothermal Sources (515KB)

  24. The Santa Rosa -- Geysers Recharge Project, Geysers Geothermal Field, California, USA

    Mitchel A. Stark, W. Tom Box Jr., Joseph J. Beall, Keshav P. Goyal and Alfonso S. Pingol · World Geothermal Congress · 2005 ·24. Field Management

    … day of tertiary-treated municipal wastewater via a 65-km pipeline for injection at the 750-mw Calpine portion of the Geysers geothermal field. Since start-up in November 2003, over 11 million m3 have been delivered and injected, as of August 31, 2004. This …

    View paper: The Santa Rosa -- Geysers Recharge Project, Geysers Geothermal Field, California, USA PDF: The Santa Rosa -- Geysers Recharge Project, Geysers Geothermal Field, California, USA (179KB)

  25. Condensation Pot Design: Model Tests

    Freeston, Derek H. · Geothermal Resources Council Transactions · 1981 ·Two phase flow; Catchpots; Equipment design; Fluid dynamics

    … of the condensation catchpote on the main steam pipelines at Wairakei Power Station. The first series of tests was concerned with recommending a design for a new 1.22 m (48 in) diameter steam main. The second series was an attempt to improve the …

    View paper: Condensation Pot Design: Model Tests Download unavailable

‹ Previous 1 2 3 Next ›

Papers are freely accessible. Copyright remains with the authors and conference organisers as stated on each paper.

IGA Conference Paper Database · New search