Morton, Laura Smith
·
Geothermal Resources Council Transactions
·
2009
·Laws and regulations; Leasing; Permitting; Environmental asp
abstract not provided
View paper: Developing Geothermal Resources on Public Lands: Fast Cash, Slow Permits
Download unavailable
-
Krassimir Barokov and Vassil Toshev
·
World Geothermal Congress
·
2010
·3. Legal and Regulatory Aspects
… waters are owned by the State or by the Municipalities. Permits issued by the Minister of Environment and Water are required for state-owned thermal waters used for treatment, rehabilitation and prevention, space heating, swimming pools, thermal water …
View paper: Regulatory Framework for Thermal Waters in Bulgaria
PDF: Regulatory Framework for Thermal Waters in Bulgaria (28KB)
-
Au?ur Andr?sd?ttir, ?skar Sigurdsson and Teitur Gunnarsson
·
Iceland Geothermal Conference
·
2003
·Environmental Aspects
… regarding environmental impact assessment and necessary permits must be taken into account at different stages of planning and preparing geothermal power plants. Before deciding on exploitation the next stage following recognition of a feasible geothermal …
View paper: Regulatory framework and preparation of geothermal power plants in Iceland թ՞ practical experience and obstacles
PDF: Regulatory framework and preparation of geothermal power plants in Iceland թ՞ practical experience and obstacles (202K)
-
Harry J. Olson and John E. Deymonaz
·
World Geothermal Congress
·
1995
·SECTION 5 - Drilling and Completion Technology
… agency approvals coordinated to ensure that all necessary permits were issued. To assess the geothermal potential of the KERZ, an array of four holes, three of which were drilled, were sited along the long axis of the within existing Geothermal Resource …
View paper: The Use of Slim Hole Drilling Technology in the Hawaiian Scientific Observation Hole (SOH) Program: A Case History
PDF: The Use of Slim Hole Drilling Technology in the Hawaiian Scientific Observation Hole (SOH) Program: A Case History
-
Hoyer, Dan; Shafer, Phil
·
Geothermal Resources Council Transactions
·
1983
·Permitting; Laws and regulations; Environmental aspects; Air
… project in Imperial Valley. All discussion relate to permits for project located on private lands. Developments on state lands would be similar but involve several more regulatory agencies. Development on federal land would be only generally similar. …
View paper: Geothermal Permitting in Imperial County
Download unavailable
-
Klein, Christopher W.; Johnson, Stuart; Spielman, Paul
·
Geothermal Resources Council Transactions
·
2007
·Hydrogeology; Geochemical surveys; Injection; Water quality
Under operating permit regulations, groundwater wells near the Steamboat geothermal field have been monitored since the early 1980s to detect changes that may be caused by injection of spent geothermal fluids back into the reservoir. The phreatic aquifer to …
View paper: Resource Exploitation at Steamboat, Nevada: What it takes to Document and Understand the Reservoir/Groundwater/Community Interaction
Download unavailable
-
Bell, Douglas G.; Hill, Richard E.
·
Geothermal Resources Council Transactions
·
1986
·Drilling; Drilling fluids; Economics; Equipment design
Santa Fe Geothermal, Inc. owns and operates an 80 megawatt power plant in the Geysers area near Middletown, California. Two geothermal steam wells were drilled during the summer of 1985 utilizing a closed mud system, with no sump, resulting in substantial …
View paper: Description of a Closed Drilling Mud Recycle System Without a Sump
Download unavailable
-
Wonstolen, Kenneth A.
·
Geothermal Resources Council Transactions
·
1986
·Direct use; District heating/cooling; Space heating/cooling;
A threshold issue in the development of geothermal heat supply systems is whether the system can penetrate existing utility monopoly service areas. The question is applicable to both single and multiple user/district heating systems and arises vis a vis …
View paper: Geothermal Heating: Penetration of Utility Monopolies
Download unavailable
-
Moorehead, Margaret A.; Priest, Barbara J.
·
Geothermal Resources Council Transactions
·
1983
·Laws and regulations; Permitting; Land use; Environmental as
The Oregon Department of Energy (ODOE) is developing model siting standards for small geothermal facilities which can be adapted to county zoning ordinances. Most counties either omit geothermal facilities from their planning documents or evaluate …
View paper: State and County Regulation of Small Geothermal Electrical Generation Facilities in Oregon
Download unavailable
-
Pearl, Richard Howard; Galloway, Michael J.; Dick, Jay D.
·
Geothermal Resources Council Transactions
·
1978
·Direct use; Exploration; Permitting; Geological surveys; Geo
The geothermal at two areas in Colorado-Pagosa Springs and Glenwood Springs are being explored and developed for direct application uses. At the first site, Pagosa Springs, any thermal waters developed will primarily be used to heat a new high school complex. …
View paper: The Pagosa Springs Project--The First Permitted Geothermal Wells in Colorado
Download unavailable