Skip to content
International Geothermal Association Conference Paper Database Live

Searches title, authors, abstract, keywords and session. Use "quotes" for an exact phrase.

Advanced search

All filled fields must match. Conference and year are added to the filters on the left.

Filters

Show filters
Conference
Year
–

1–8 of 8 papers

  1. GEOTHERMAL DRILLING PERFORMANCE IMPROVEMENT THROUGH A COMPREHENSIVE NON-PRODUCTIVE TIME ANALYSIS

    R. Putri, F. Ranti, G. Rifki, F. Fadilah, A. Rachmadani and D. Irwansyah · New Zealand Geothermal Workshop · 2021

    … time in geothermal well construction, commonly defined as Non-Productive Time (NPT). NPT has a direct relationship to the cost overrun of wells. Processing standardized daily drilling reports is the main information in identifying existing NPT, which …

    View paper: GEOTHERMAL DRILLING PERFORMANCE IMPROVEMENT THROUGH A COMPREHENSIVE NON-PRODUCTIVE TIME ANALYSIS PDF: GEOTHERMAL DRILLING PERFORMANCE IMPROVEMENT THROUGH A COMPREHENSIVE NON-PRODUCTIVE TIME ANALYSIS (447KB)

  2. A Non-Productive Time Analysis from Geothermal Drilling Campaign in West Java to Improve Future Drilling Planning

    A. Rachmadani, R. Kusumawardani, G.P. Rizkiani, R. Redhiza, D.C. Irwansyah, K.D. Yasa, S. Nainggolan and N.F. Rozi · New Zealand Geothermal Workshop · 2020 ·Session 8.3

    … might prolong the drilling operation can be classified as Non-Productive Time (NPT), and this period will contribute to the cost overrun of the well. Understanding the major NPT happened in a drilling campaign and extracting lessons learned out of it, is …

    View paper: A Non-Productive Time Analysis from Geothermal Drilling Campaign in West Java to Improve Future Drilling Planning PDF: A Non-Productive Time Analysis from Geothermal Drilling Campaign in West Java to Improve Future Drilling Planning (211KB)

  3. Analysis of Non-Productive Time in Geothermal Drilling Operations - A Case Study of Olkaria

    Brenda NYOTA, Moses MURIGU · Stanford Geothermal Workshop · 2017 ·Drilling

    … the cost of a well. To achieve this, an analysis of the non-productive time incurred while drilling a well is necessary so as to identify areas of improvement. This paper gives a review of the non-productive time incurred while drilling geothermal wells …

    View paper: Analysis of Non-Productive Time in Geothermal Drilling Operations - A Case Study of Olkaria PDF: Analysis of Non-Productive Time in Geothermal Drilling Operations - A Case Study of Olkaria (331 KB)

  4. Reducing Flat Time in Geothermal Drilling: Surface-Landed Threaded Wellhead Installation

    Anil Tokcan, Sami Atalay, Ernesto Rivas, William M. Rickard · World Geothermal Congress · 2026 ·Advances in Well Engineering and Pump Technology - Part 1

    Reducing non-productive time (NPT) is critical in geothermal drilling, where complex formations and high costs demand operational efficiency. We present a field-proven wellhead installation method that eliminates waiting on cement time by landing each casing …

    View paper: Reducing Flat Time in Geothermal Drilling: Surface-Landed Threaded Wellhead Installation PDF: Reducing Flat Time in Geothermal Drilling: Surface-Landed Threaded Wellhead Installation

  5. Geothermal Drilling Time Analysis-A Case Study of Menengai and Hengill

    Lilian OKWIRI · World Geothermal Congress · 2015 ·Drilling and Completion Technology

    … solutions and solving these problems. This contributes to non-productive time (NPT). Problems occurring in drilling can be avoided sometimes but in other occasions they are beyond the drilling crew control, their causes are numerous and their effects …

    View paper: Geothermal Drilling Time Analysis-A Case Study of Menengai and Hengill PDF: Geothermal Drilling Time Analysis-A Case Study of Menengai and Hengill (601 KB)

  6. Planning for Efficient Drilling Operations (A Case Study of Drilling Well PW 03B)

    Esther Nyambura Njuguna · World Geothermal Congress · 2026 ·Advances in Drilling Technologies & Data - Part 2

    … equipment and human resource which translates into non-productive time and consequently high costs. Drilling in Paka started in the year 2018, and as of May, 2025, nineteen wells had been drilled. Among them is Paka Well 03B (PW 03B) drilled between …

    View paper: Planning for Efficient Drilling Operations (A Case Study of Drilling Well PW 03B) PDF: Planning for Efficient Drilling Operations (A Case Study of Drilling Well PW 03B)

  7. Drilling Activities and Parameters Analysis to Optimize Stuck Pipe Prevention in a Geothermal Field

    A. Yuswandari, D. Maulana, D. Purba and D. Adityatama · New Zealand Geothermal Workshop · 2020

    … caused by the long duration of geothermal drilling due to non-productive time. The long duration for non-productive time represents problems encountered in geothermal well drilling. One of the most frequent problems is the stuck pipe, a condition whereby …

    View paper: Drilling Activities and Parameters Analysis to Optimize Stuck Pipe Prevention in a Geothermal Field PDF: Drilling Activities and Parameters Analysis to Optimize Stuck Pipe Prevention in a Geothermal Field (883KB)

  8. Rotary Steerable Systems to Reduce the Cost and Increase the Energy Value of Drilling Directional Wells in Olkaria Geothermal Field

    George Karimi · ARGeo · 2016

    … turn inflates the operational costs incurred during this non-productive time. Wells drilled with very little control on the trajectory, lead to uncontrolled doglegs which cause high side forces on the string, which lead in turn to high torque, high drag …

    View paper: Rotary Steerable Systems to Reduce the Cost and Increase the Energy Value of Drilling Directional Wells in Olkaria Geothermal Field PDF: Rotary Steerable Systems to Reduce the Cost and Increase the Energy Value of Drilling Directional Wells in Olkaria Geothermal Field (1102 KB)

Papers are freely accessible. Copyright remains with the authors and conference organisers as stated on each paper.

IGA Conference Paper Database · New search