  1. Modelling the evolution of a mine pit in a geothermal field at Lihir Island, Papua New Guinea

    John O'Sullivan, Adrian Croucher, Michael O'Sullivan, Lynell Stevens, Miguel Esberto · New Zealand Geothermal Workshop · 2011 ·Reservoir Modelling

    … the evolution of a mine pit in a geothermal field at Lihir Island, Papua New Guinea

    View paper: Modelling the evolution of a mine pit in a geothermal field at Lihir Island, Papua New Guinea PDF: Modelling the evolution of a mine pit in a geothermal field at Lihir Island, Papua New Guinea (1 MB)

  2. Evolution of the Ladolam Geothermal System on Lihir Island, Papua New Guinea

    Phil White, Greg Ussher, Danilo Hermoso · World Geothermal Congress · 2010 ·12. Geology

    … million ounce epithermal gold deposit are superimposed on Lihir (or Niolam) Island. Recent petrology studies and geophysical surveys indicate that the Ladolam geothermal system has a very complex history. Many previous authors have recognised that a major …

    View paper: Evolution of the Ladolam Geothermal System on Lihir Island, Papua New Guinea PDF: Evolution of the Ladolam Geothermal System on Lihir Island, Papua New Guinea (4736KB)

  3. Recent Exploration Drilling at Lihir Geothermal Field, PNG: Effects of Catastrophic Sector Collapse on a Magmatic-Hydrothermal System

    Andrew J. Rae, L. Ernesto Ramirez, Gener Villafuerte, Geoff Kilgour, Sarah D. Milicich, Hamish Fraser, Greg Bignall · World Geothermal Congress · 2010 ·12. Geology

    … exploratory wells (GW47, GW52, GW54) at Luise Harbour, Lihir Island, reveal an intrusive complex underlying lavas and volcaniclastic breccias of the Ladolam breccia complex. The intrusive rocks consist of porphyritic to equigranular, cumulate …

    View paper: Recent Exploration Drilling at Lihir Geothermal Field, PNG: Effects of Catastrophic Sector Collapse on a Magmatic-Hydrothermal System PDF: Recent Exploration Drilling at Lihir Geothermal Field, PNG: Effects of Catastrophic Sector Collapse on a Magmatic-Hydrothermal System (365KB)

  4. Magneto-telluric (MT) surveys in a challenging environment at Lihir Island, PNG

    Greg Ussher, Jacques Charroy, Jose (Jun) Seastres and Gener Villafuerte · World Geothermal Congress · 2010 ·13. Geophysics

    … 6 MW was commissioned in 2003, the geothermal resource at Lihir Island in Papua New Guinea has been progressively developed to power gold mining operations with present capacity at about 56 MW. A desire to further expand power generation led to the …

    View paper: Magneto-telluric (MT) surveys in a challenging environment at Lihir Island, PNG PDF: Magneto-telluric (MT) surveys in a challenging environment at Lihir Island, PNG (3242KB)

  5. Geochemistry of the Lihir Geothermal Field, Papua New Guinea.

    Kevin L. Brown and Paul F. Bixley · World Geothermal Congress · 2005 ·8. Geochemistry

    The Lihir mine is located on Lihir Island, Papua New Guinea and is currently one of the largest epithermal gold mines in the world. The mine is situated inside an active geothermal system. A number of wells have been drilled and discharged to reduce …

    View paper: Geochemistry of the Lihir Geothermal Field, Papua New Guinea. PDF: Geochemistry of the Lihir Geothermal Field, Papua New Guinea. (192KB)

  6. Geothermal Energy Resources of Papua New Guinea: Country Update

    Maxine LAHAN, Gener VILLAFUERTE, Lynell STEVENS · World Geothermal Congress · 2020 ·Country Updates

    … an installed capacity of 50MW geothermal power plant on Lihir Island, owned and operated by Newcrest Mining Limited within its gold mining lease. Apart from this, geothermal energy research and development including other renewable energy sources has been …

    View paper: Geothermal Energy Resources of Papua New Guinea: Country Update PDF: Geothermal Energy Resources of Papua New Guinea: Country Update (995 KB)

  7. Papua New Guinea Country Update

    Ita KUNA and Richard ZEHNER · World Geothermal Congress · 2015 ·Country Updates

    … There are currently 55 MW of geothermal power installed at Lihir Gold Mine in New Ireland Province. However, there have not been any additional power plants constructed in the past five years, mostly due to lack of adequate legislation and government …

    View paper: Papua New Guinea Country Update PDF: Papua New Guinea Country Update (1123 KB)

  8. Geothermal Development in Papua New Guinea, a Country Update Report 2005-2009

    M. Melaku, D. Mendive · World Geothermal Congress · 2010 ·1. Country Updates

    Lihir Island is located about 700 kilometers northeast of the capital of Papua New Guinea, Port Moresby (Figure 1). Gold ore was discovered on the island in 1982, and gold production began in May 1997 by Lihir Gold Ltd (LGL). The Lihir gold mine project is …

    View paper: Geothermal Development in Papua New Guinea, a Country Update Report 2005-2009 PDF: Geothermal Development in Papua New Guinea, a Country Update Report 2005-2009 (148KB)

  9. Depressurization as a Strategy for Mining Ore Bodies with an Active Geothermal System

    Romeo Rodriguez, Zosimo Aunzo, Jacqueline Kote and Samuel Gumo · Stanford Geothermal Workshop · 2008 ·Field Studies

    The Lihir Gold Mine in Papua New Guinea is a world-class open pit gold mine that contains an active geothermal system. Temperatures within the ore bodies are up to 200°C and this presents a major constraint to mining operations and creates the potential for …

    View paper: Depressurization as a Strategy for Mining Ore Bodies with an Active Geothermal System PDF: Depressurization as a Strategy for Mining Ore Bodies with an Active Geothermal System (821KB)

  10. Geothermal Development in Papua New Guinea a Country Update Report 2000-2005

    G. Martin Booth III and Paul F. Bixley · World Geothermal Congress · 2005 ·1. Country Updates

    Geothermal power development, presently focused on tiny Lihir Island, located about 700 kilometers northeast of the national capital, Port Moresby, forms part of the New Ireland Province of Papua New Guinea. Unusual challenges to the developer, Lihir Gold …

    View paper: Geothermal Development in Papua New Guinea a Country Update Report 2000-2005 PDF: Geothermal Development in Papua New Guinea a Country Update Report 2000-2005 (440KB)

Papers are freely accessible. Copyright remains with the authors and conference organisers as stated on each paper.

IGA Conference Paper Database · New search