-
Gamal HASTRIANSYAH, Dhanie Marstiga YUNIAR, Fadiel Evan MARASTIO, Fernando PASARIBU, Marihot SILABAN
·
World Geothermal Congress
·
2020
·Reservoir Engineering
… a liquid dominated field had some impediments in locating injection wells. Pertamina had faced injection well problem in Tompaso Field when they had to decide whether to drill injection or production well (Hastriansyah, 2015). Hastriansyah (2015) used Nodal …
View paper: Determination of Optimum Injection Capacity Using Pressure Transient Analysis
PDF: Determination of Optimum Injection Capacity Using Pressure Transient Analysis (713 KB)
-
Ariki, Kazuharu; Akibayashi, Satoshi
·
Geothermal Resources Council Transactions
·
2001
·Injection; Fractures
View paper: Effects of Injection Temperature on Injection Capacity of Geothermal Wells--Numerical Study
Download unavailable
-
Federico Nietzen
·
World Geothermal Congress
·
2026
·Poster
… (binary fluids technology). Over time, a decline in the reinjection capacity of one of the main wells (PGP-25) is observed, necessitating the transfer of unused fluids to another area of the field. This action causes cooling in the Pailas II production …
View paper: Reactivation of a Clogged Reinjection Well by Opening and Putting into Production. Stabilization of Reinjection and Mitigation of the Generation Drop at the Pailas Geothermal Field
PDF: Reactivation of a Clogged Reinjection Well by Opening and Putting into Production. Stabilization of Reinjection and Mitigation of the Generation Drop at the Pailas Geothermal Field (149KB)
-
Q. Zhu, G. Robertson
·
New Zealand Geothermal Workshop
·
2025
·Session 4.2 - PRODUCTION & MANAGEMENT 2
… geothermal power plant relies on a northern and southern reinjection pipeline system to return geothermal fluids to the reservoir. Commissioning of the Nga Tamariki OEC5 unit will see the station’s reinjection demand increase from 2,300 t/h to 3,150 t/h. …
View paper: Optimising reinjection capacities for Nga Tamariki power plant
PDF: Optimising reinjection capacities for Nga Tamariki power plant (747KB)
-
F.E. Marastio, G. Hastriansyah, M.B. Saputra, M.T. Arifin, F. Pasaribu and M.S.P. Silaban
·
New Zealand Geothermal Workshop
·
2020
Ensuring the performance of reinjection wells is important for the sustainability of geothermal field management. One of the problems that is rarely noticed in the reinjection performance is the interference-effect. The interference-effect could cause a …
View paper: Simulating Interference Effect Between Reinjection Wells
PDF: Simulating Interference Effect Between Reinjection Wells (699KB)
-
Sanyal, S. K.; Lovekin, J. W.; Henneberger, R. C.; Robertson-Tait, A.; Brown, P. J.; Morris, C. L.; Schochet, D.
·
Geothermal Resources Council Transactions
·
2003
·HDR/EGS; Injection; Stimulation; Formation Evaluation; Well
View paper: Injection Testing for an Enhanced Geothermal System Project at Desert Peak, Nevada
Download unavailable
-
Naoto Kumagai and Koji Kitao
·
World Geothermal Congress
·
2000
·Reservoir Evaluation
… water and steam condensate are reinjected into each reinjection well. In these five years, many reinjection wells have encountered some problems. For example, the wellhead pressure of SD-1 was kept constant condition, while the amount of the thermal …
View paper: Reinjection Problems Encountered in Sumikawa Geothemal Power Pnant, Japan
PDF: Reinjection Problems Encountered in Sumikawa Geothemal Power Pnant, Japan (476 B)
-
Shook, G. Michael
·
Geothermal Resources Council Transactions
·
2003
·Injection; Tracer testing; Fractures
View paper: A Simple, Fast Method of Estimating Fractured Reservoir Geometry from Tracer Tests
Download unavailable
-
Enrique A. Porras and Grimur Bjornsson
·
World Geothermal Congress
·
2010
·6. Case Histories
… undertook to drill additional wells, implementing a full reinjection and installing a bottoming OEC unit. Since then the plant is producing 30 MWe supported by an intensive well maintenance program. Ormat’s investment stands at about US$ 45 Million, …
View paper: The Momotombo Reservoir Performance upon 27 Years of Exploitation
PDF: The Momotombo Reservoir Performance upon 27 Years of Exploitation (159KB)
-
Grant, Malcolm A.
·
Geothermal Resources Council Transactions
·
1979
·Power plant design and operation; Two phase flow; Flash stea
A lumped parameter model of Broadlands geothermal field was used to study possible power station configurations. For two stage flash, a broad optimum was found in the inlet pressure on the turbine, from 6 to 10 bar with a value at the low end of range, 6.2 …
View paper: Broadlands Optimisation
Download unavailable