Osvaldo Vallejos-Ruiz, Eddy S·nchez-Rivera, Carlos Gonz·lez-Vargas
·
World Geothermal Congress
·
2005
·24. Field Management
The Miravalles Geothermal Field has been continuously exploited since 1994. The total installed capacity has reached 163 MW, accounting for about 8% of Costa Rica's total electrical production and it has become the foundation of the electrical supply in the …
View paper: Reservoir Management at the Miravalles Geothermal Field, Costa Rica
PDF: Reservoir Management at the Miravalles Geothermal Field, Costa Rica (869KB)
-
K.M. MATURGO, L.C.D. FERNANDEZ, M.V.M. OLIVAR, M.B. ESBERTO, P.G. CALLOS, L.J. LLANERIZAS
·
World Geothermal Congress
·
2015
·Field Management
The Maibarara Geothermal Field is located approximately 70 kms south of the capital city of Manila, within the volcanic zone associated with the Macolod Corridor. The proven reservoir area, about 2.5 km2, is a liquid-dominated system with neutral-pH fluids …
View paper: Challenges in the Design and Management of a 20-MW Geothermal Field: the Maibarara Geothermal Field (Philippines) Experience
PDF: Challenges in the Design and Management of a 20-MW Geothermal Field: the Maibarara Geothermal Field (Philippines) Experience (1312 KB)
-
D.M. Yglopaz, R.C.M. Malate, A.E. Amistoso, A.R. Aqui, R.G. Orizonte and D.R. Sanchez
·
World Geothermal Congress
·
2005
·24. Field Management
The Northern Negros Geothermal Field in the northwestern slope of Canlaon Volcano, Negros Occidental province, Philippines is a high temperature (290oC) liquid-dominated geothermal system with an upflow region southeast of the presently drilled sector and a …
View paper: Field Management Strategies for the Development of the Northern Negros Geothermal Field, Philippines
PDF: Field Management Strategies for the Development of the Northern Negros Geothermal Field, Philippines (307KB)
-
Michelle M. Visperas, Diana Lee O. Navarro, Arnold B. Sinogba, Joseph Nikko M. Mazaredo, Miguel B
·
World Geothermal Congress
·
2026
·Reservoir Management, Reinjection and Development Strategy
… units within a 9-hectare development area. Initially, the field relied solely on an infield reinjection system, which re-introduces separated brine near production wells to help maintain reservoir pressure. In 2016 and 2022, MGI conducted reservoir tracer …
View paper: Reservoir Tracer Testing in Maibarara Geothermal Field:
Evolution of Maibarara’s Field Management Strategy
PDF: Reservoir Tracer Testing in Maibarara Geothermal Field:
Evolution of Maibarara’s Field Management Strategy
-
M. Rizqi AL ASYARI, Daniel W. ADITYATAMA, Dorman PURBA
·
Stanford Geothermal Workshop
·
2023
·Field Studies
… the reservoir was managed during exploitation. Improper field management strategy may lead to rapidly declining reservoir pressure and production. Devising a proper field and reservoir management requires a good understanding on the geothermal reservoir …
View paper: Geothermal Field Management Strategies: Various Cases and Lesson Learn from Top Geothermal Producer Countries
PDF: Geothermal Field Management Strategies: Various Cases and Lesson Learn from Top Geothermal Producer Countries (943 KB)
-
de Leon Vivar, Jesus
·
Geothermal Resources Council Transactions
·
2003
·Reservoir Engineering; Software; Data Management; Field Deve
View paper: A Suite of Computer Programs Used in the Development and Management of the Cerro Prieto Geothermal Field
Download unavailable
-
Neri, Giuseppe
·
Geothermal Resources Council Transactions
·
1990
·Reservoir management; Reservoir modeling
… possible management criteria of the Larderello geothermal field. Firstly the concept of the optimum delivery pressure is presented, then the effects on both the reservoir an the electrical production , caused by a hypothetical increase or decrease of the …
View paper: Management Criteria of the Larderello Geothermal Field
Download unavailable
-
Minh Tran
·
World Geothermal Congress
·
2026
·Poster
Mature geothermal fields like The Geysers, the world's largest, are increasingly encountering superheated steam conditions within their formations. To address the decline in steam production, supplementary water sources have been integrated into injection …
View paper: Enhancing Field Management Strategy Through Precise Modeling of Superheated Steam
PDF: Enhancing Field Management Strategy Through Precise Modeling of Superheated Steam (3224KB)
-
Wibisono Yamin, Agus Riyadi, Komar Wardana, Albert Lukman, Asfaari Raasyidah
·
World Geothermal Congress
·
2023
·Big Data and Data Analytics
… Geothermal Darajat II, LIMITED (SEGD II) operates steam field and two power plants, Unit II and III with capacity of 95 and 121 MW respectively and provides steam for Unit I which is operated by PT Indonesia Power. To ensure a reliable and sustainable …
View paper: Integrated Field Management Program Implementation for Energy Efficiency Improvement in Star Energy Geothermal Darajat Unit II and Unit III Power Plants
PDF: Integrated Field Management Program Implementation for Energy Efficiency Improvement in Star Energy Geothermal Darajat Unit II and Unit III Power Plants (1,54 MB)
-
Arnel MEJORADA, Joy TOLENTINO, Ronald VICEDO
·
World Geothermal Congress
·
2020
·Case Histories
The Tiwi Geothermal Field in Albay, Philippines is operated by Philippine Geothermal Production Company Inc. (PGPC). It began commercial operations in 1979 (Menzies et al, 2010a), initially with shallow production well drilling concentrated in the Naglagbong …
View paper: Tiwi Geothermal Field: Reservoir Management After 40 Years of Commercial Operation
PDF: Tiwi Geothermal Field: Reservoir Management After 40 Years of Commercial Operation (1211 KB)
-
Hartman GUIDO SEQUEIRA
·
World Geothermal Congress
·
2015
·Environmental and Societal Aspects
… aspects related to the exploitation of the Geothermal Fields in Costa Rica, how the environmental management has been carried out and the results of this management so far. As a conclusion is shows the feasibility of the sustainable development of …
View paper: Environmental Management at Geothermal Fields of Costa Rica after 20 years of Exploitation
PDF: Environmental Management at Geothermal Fields of Costa Rica after 20 years of Exploitation (2687 KB)
-
Suryadarma, Tavip Dwikorianto, Agus Zuhro
·
World Geothermal Congress
·
2010
·5. Sustainability
Kamojang is the first geothermal field in Indonesia, and it is known as one of the vapor-dominated systems of the world. It was first producing steam in 1978 to generate electricity for its own use through a 250 KW mono-block unit. The first commercial …
View paper: Lessons Learned from Kamojang Geothermal Steam Field Management: from the Beginning Until Now
PDF: Lessons Learned from Kamojang Geothermal Steam Field Management: from the Beginning Until Now (1725KB)
-
Hartman Guido-Sequeira
·
World Geothermal Congress
·
2005
·2. Environmental and Societal Aspects
… for strengthening the environmental sustainability of the field and for the future development of new fields in Costa Rica.
View paper: The ISO 14 001 Environmental Management System Applied at the Miravalles Geothermal Field.
PDF: The ISO 14 001 Environmental Management System Applied at the Miravalles Geothermal Field. (76KB)
-
Adriano C. Cabel, Jr., Romerico C. Gonzalez and Manuel S. Ogena
·
Asian Geothermal Symposium
·
2004
·High-Temperature Resource Development
… need to be developed and the potential of the producing fields need to be maximized while maintaining current levels of production. Sustaining the geothermal industry in the Philippines cannot be done by any single entity. Instead, several organizations …
View paper: Sustaining the Philippine Geothermal Industry: Innovative Approaches in Investment Promotion and Field Management
PDF: Sustaining the Philippine Geothermal Industry: Innovative Approaches in Investment Promotion and Field Management (2.7 MB)
-
Arias Sugandhi and Jeffrey Wayne Roberts
·
World Geothermal Congress
·
2000
·Reservoir Evaluation
… wells without circulation in the Darajat Geothermal Field, West Java, Indonesia, significant changes occurred in gas chemistry of adjacent wells. The drilling of well DRJ-23, without circulation, caused gas/steam ratios in some wells in the southern …
View paper: Gas Breakthrough' During Drilling at Darajat and Implications for Steamfield Management
PDF: Gas Breakthrough' During Drilling at Darajat and Implications for Steamfield Management (383 B)
-
Raymundo G. Orizonte, Arthur E. Amistoso and A. R. Aqui
·
World Geothermal Congress
·
2000
·Reservoir Evaluation
The Southern Negros Geothermal Production Field in the Philippines has been exploited for electrical energy production since 1983. Steam production has been affected by the problems encountered in the production and reinjection wells, namely, mineral …
View paper: Reservoir Management During 15 Years of Exploitation: Southern Negros Geothermal Production Field
PDF: Reservoir Management During 15 Years of Exploitation: Southern Negros Geothermal Production Field (517 B)
-
Iglesias, Eduardo R.; Torres, Rodolfo J.; Garcia, Yalu; Barragan, Rosa Maria; Arellano, V. A.; Mendoza, Pedro
·
Geothermal Resources Council Transactions
·
1997
·Reservoir management; Reservoir engineering; Software; Datab
View paper: BDGEO 4.0: An Efficient System for Assessment and Management of Geothermal Fields
Download unavailable
-
Dennis KASPEREIT, William RICHARD, William L. OSBORN, Mary MANN, Magdalena PEREZ
·
Stanford Geothermal Workshop
·
2016
·Reservoir Engineering
The Momotombo geothermal field has been in development since the 1960s, with most drilling completed in the 1970s, and was on line with its first 35 MWg geothermal flash power plant in September 1983. The field has had several operators in its 33-year …
View paper: Field Management and Expansion Potential of the Momotombo Geothermal Field Using Numerical Simulation and Conceptual Modeling
PDF: Field Management and Expansion Potential of the Momotombo Geothermal Field Using Numerical Simulation and Conceptual Modeling (1441 KB)
-
Ramonchito Cedric M. Malate and Arvin A. Aqui
·
World Geothermal Congress
·
2010
·24. Field Management
The Southern Negros Geothermal Production Field (SNGPF) in Central Philippines, has been supplying steam to the 112.5MW (3x37.5) power plant in Palinpinon 1 and the 80MW (4x20) modular plants in Palinpinon 2 in the last 27 and 17 years, respectively. Field …
View paper: Steam Production from the Expanded Two-Phase Region in the Southern Negros Geothermal Production Field, Philippines
PDF: Steam Production from the Expanded Two-Phase Region in the Southern Negros Geothermal Production Field, Philippines (698KB)
-
Eddy S·nchez-Rivera, Osvaldo Vallejos-Ruiz, Alejandro Rodriguez-Badilla, Hartman Guido-Sequeira
·
World Geothermal Congress
·
2005
·20. Corrosion and Scaling
… the commercial exploitation of the Miravalles Geothermal Field without the application of chemical treatments to the produced waters would be impossible, since 25 out of 26 producing wells require these treatments. The CaCO3 scaling is observed in 23 …
View paper: Chemical Treatments of Fluids at the Miravalles Geothermal Field: Investigation, Application and its Relationship With Reservoir Management
PDF: Chemical Treatments of Fluids at the Miravalles Geothermal Field: Investigation, Application and its Relationship With Reservoir Management (707KB)
-
Eddy Sánchez-Rivera, Osvaldo Vallejos-Ruiz and Carlos González-Vargas
·
World Geothermal Congress
·
2010
·24. Field Management
The Miravalles Geothermal Field has operated continually since 1994 when a 55 MWe power plant was commissioned, and has raised its installed capacity up to 163 MWe in the present time. As any other aquifer under exploitation, the sustainability of the …
View paper: Maintenance of the Production in the Miravalles Geothermal Field, Costa Rica: New Productive Zones
PDF: Maintenance of the Production in the Miravalles Geothermal Field, Costa Rica: New Productive Zones (674KB)
-
Suryadarma, Tafif Azimuddin, Tavip Dwikorianto, Amir Fauzi
·
World Geothermal Congress
·
2005
·24. Field Management
Kamojang is the first Geothermal Field in Indonesia, and it is known as one of vapor dominated systems in the world. It first started producing steam in 1978 in order to generate electricity for its own use through a 250 KW monobloc unit. The first commercial …
View paper: The Kamojang Geothermal Field: 25 Years Operation
PDF: The Kamojang Geothermal Field: 25 Years Operation (327KB)
-
Roman B. Sta. Maria, Ma. Fe Villadolid Abrigo, David Sussman and Philip G. Mogen
·
World Geothermal Congress
·
1995
·SECTION 7 - Field Management and Monitoring
… the brine and condensate produced in the Bulalo geothermal field has been injected since 1979, when the first two 55 power plants came on-line. However, in 1989 the return of the cool injectate to the reservoir caused well productivity declines in the …
View paper: Development Strategy for the Bulalo Geothermal Field, Philippine
PDF: Development Strategy for the Bulalo Geothermal Field, Philippine
-
Enedy, Steven L.
·
Geothermal Resources Council Transactions
·
2014
·Reservoir management; Injection
… typical injection well has been developed for The Geysers Field. The IB Model is a spreadsheet based model which consists of actual and/or proposed injection rate for wells in gallons per minute (gpm) and converts the injection rate to an average megawatt …
View paper: Benefit of a Typical Injection Well at The Geysers Field
Download unavailable
-
Kay Kimberly L. KOBAYASHI, Kenneth G. TABOCO, Joeny Q. BERMEJO, Aldrine O. ALMANZOR, Danilo B. DACILLO
·
Stanford Geothermal Workshop
·
2024
·Field Studies
… decline was the reservoir cooling caused by the infield cold reinjection due to the limitation of both hot and cold brine/condensate conveyance to the distant reinjection pad. The condensate lines were upgraded as well as the maximization of the hot …
View paper: Mahanagdong Reservoir Response to the Termination of Infield Cold Reinjection