Skip to content
International Geothermal Association Conference Paper Database Live

Searches title, authors, abstract, keywords and session. Use "quotes" for an exact phrase.

Advanced search

All filled fields must match. Conference and year are added to the filters on the left.

Filters

Show filters
Conference
Year
–

1–15 of 15 papers

  1. Germencik: A Thoroughly Modern Flash Plant in Turkey

    Wallace, Kevin; Dunford, Tim; Ralph, Marshall; Harvey, William · Geothermal Resources Council Transactions · 2009 ·Power plant design and operation; Dual flash; NCG; Air quali

    The Germencik 45 MW dual-flash geothermal power station – a large new power station near Izmir – is the newest addition to Turkey´s renewable energy landscape. The plant, shown in Figure 1, was completed in Spring 2009 by the Turkish company Güri? and is …

    View paper: Germencik: A Thoroughly Modern Flash Plant in Turkey Download unavailable

  2. Geo East Mesa Geothermal Project: Pumped, Double Flash Technology

    Knox, Lauri A.; Moore, Michael C. · Geothermal Resources Council Transactions · 1990 ·Power plant design and operation; Flash steam power generati

    … geothermal plant to use pumped wells with double flashing technology. The well pumps are the deepest set pumps used in the industry with settings as deep as 1500 feet. A general overview of the GEO East Mesa Geothermal Project is presented with a …

    View paper: Geo East Mesa Geothermal Project: Pumped, Double Flash Technology Download unavailable

  3. Low Temperature Flashed Steam Power Generation

    Gary Shulman · World Geothermal Congress · 1995 ·SECTION 9 - Power Generation

    Flashed steam power generation can be operated economically with geothermal reservoir temperatures below 177?C. A two stage flash steam plant in Nevada. USA, is described, designed for an initial reservoir temperature of 174?C. Reservoir temperatures as low …

    View paper: Low Temperature Flashed Steam Power Generation PDF: Low Temperature Flashed Steam Power Generation

  4. Operational History of the Geothermal Loop Experimental Facility at the Salton Sea KGRA

    Jacobson, W. O. · Geothermal Resources Council Transactions · 1978 ·Binary cycle power generation; Flash steam power generation;

    … to be completed. The study concluded that a two stage flash cycle is optimum for near term development rather than the original four stage flash/binary process. Principal remaining risks are related to the Salton Sea brines. Reliable production, …

    View paper: Operational History of the Geothermal Loop Experimental Facility at the Salton Sea KGRA Download unavailable

  5. Dieng Geothermal Field: Testing of the effectiveness of pH modification for the mitigation of silica and arsenic-sulfide scaling in heat extraction process using a pilot plant.

    Trausti HAUKSSON, Hari WIDIANTO, Agung Wisnu MUKTI, Þorsteinn SIGMARSSON · World Geothermal Congress · 2023 ·Production Engineering, Steam Gathering Systems Corrosion a

    … neither sufficiently effective for scale mitigation in a dual flash process operated at low secondary separator pressure. Diluting the brine with the condensate is less effective than expected because of the high ammonia content, and high pH of the …

    View paper: Dieng Geothermal Field: Testing of the effectiveness of pH modification for the mitigation of silica and arsenic-sulfide scaling in heat extraction process using a pilot plant. PDF: Dieng Geothermal Field: Testing of the effectiveness of pH modification for the mitigation of silica and arsenic-sulfide scaling in heat extraction process using a pilot plant. (0,22 MB)

  6. Cerro Prieto II (220 MW) and III (220 MW) Geothermoelectric Plants

    Mercado, S.; Bermejo, F.; Heard, C.; Fernandez, H.; Angulo, R. · Geothermal Resources Council Transactions · 1990 ·Power plant design and operation; Flash steam power generati

    Geothermal plants Cerro Prieto II and III of 220 MW each achieved excellent operation conditions during 1987 with plant factors of 0.75 and 0.86, respectively. This demonstrates the operation of large geothermal plants with plant factors higher than have been …

    View paper: Cerro Prieto II (220 MW) and III (220 MW) Geothermoelectric Plants Download unavailable

  7. Scale Inhibitor Testing at East Mesa

    Osborn, William L.; Hirtz, Paul; Robinson Haizlip, Jill · Geothermal Resources Council Transactions · 1990 ·Scaling; Calcium carbonate

    … temperature geothermal fluid from pumped wells and dual flash steam separation at the power plant. The two most effective inhibitors were selected by simple, 24 hour atmospheric flash tests; they were tested more extensively in a dual flash test …

    View paper: Scale Inhibitor Testing at East Mesa Download unavailable

  8. Potential of Geothermal and Gas Turbine Hybrid Systems

    Tiangco, Valentino; McCluer, Pete; Bharathan, Desikan · Geothermal Resources Council Transactions · 1998 ·Binary cycle power generation; Hybrid power generation; Laws

    View paper: Potential of Geothermal and Gas Turbine Hybrid Systems Download unavailable

  9. Investigation of Geothermal Energy Technologies and Gas Turbine Hybrid Systems

    Tiangco, Valentino; McCluer, Pete; Hughes, Evan · Geothermal Resources Council Transactions · 1996 ·Power plant design and operation; Turbines; Hybrid power gen

    View paper: Investigation of Geothermal Energy Technologies and Gas Turbine Hybrid Systems Download unavailable

  10. Emission Factors of Geothermal Power Plants in California

    Tiangco, Valentino; Hare, Robert; Birkinshaw, Kelly; Johannis, Mary · Geothermal Resources Council Transactions · 1995 ·Environmental aspects; Air quality; Hydrogen sulfide; Carbon

    View paper: Emission Factors of Geothermal Power Plants in California Download unavailable

  11. Applying Kalina Cycle Technology to High Enthalpy Geothermal Resources

    Kalina, A. I.; Leibowitz, H. M. · Geothermal Resources Council Transactions · 1994 ·Binary cycle power generation; Kalina cycle; Power plant des

    View paper: Applying Kalina Cycle Technology to High Enthalpy Geothermal Resources Download unavailable

  12. Thermodynamic Improvements on the Direct-Steam Plant

    DiPippo, Ronald · Geothermal Resources Council Transactions · 1992 ·Dry steam power generation; Power plant design and operation

    View paper: Thermodynamic Improvements on the Direct-Steam Plant Download unavailable

  13. Dewatering of Slurry from Geothermal Process Streams

    Benesi, Steve C. · Geothermal Resources Council Transactions · 1992 ·Equipment design; Waste management

    View paper: Dewatering of Slurry from Geothermal Process Streams Download unavailable

  14. Design and Construction of the Coso Geothermal Power Projects

    Schoonmaker, James L.; Maricle, Mark F. · Geothermal Resources Council Transactions · 1990 ·Power plant design and operation; Power grids

    The California Energy Company, Inc. (CECI) and Mission Power Engineering Company (MPE) have completed engineering and construction, and began operation of four additional geothermal generating units as part of the Coso Geothermal Project. These units are …

    View paper: Design and Construction of the Coso Geothermal Power Projects Download unavailable

  15. Cooling Water Requirements for Geothermal Power Plants and Water Availability in the Imperial Valley

    Goldsmith, Martin · Geothermal Resources Council Transactions · 1978 ·Power plant design and operation; Cooling towers

    Abstract not available

    View paper: Cooling Water Requirements for Geothermal Power Plants and Water Availability in the Imperial Valley Download unavailable

Papers are freely accessible. Copyright remains with the authors and conference organisers as stated on each paper.

IGA Conference Paper Database · New search