Rizkhy Ridoh ALAMSYAH, Iqbal MARATAMA, Siti Olivinia YUSRA, Randy Wijaya ATMAJA, Ingria Yunanda Muhammad ARRASY
·
Stanford Geothermal Workshop
·
2024
·Field Studies
The Commercial Operation Date (COD) for Dieng Powerplant Unit-1, operated by PT. Geo Dipa Energi (Persero), was in 2002 with installed capacity 1x55 MW. First well for Dieng Unit-1 drilled back in 1975 and ended in 1998. Dieng is a liquid dominated geothermal …
View paper: Project Development Update of the Dieng Unit-2 Geothermal Power Plant, Dieng Geothermal Field, Indonesia
PDF: Project Development Update of the Dieng Unit-2 Geothermal Power Plant, Dieng Geothermal Field, Indonesia (1904 KB)
-
Ichwan Agusta ELFAJRIE, Reza Jamil FAJRI, ELFINA, Muhammad Istiawan NURPRATAMA, Nurkholis HARIYADI, Alan MUHADJIR
·
Stanford Geothermal Workshop
·
2024
·Production Engineering
… and HCE-C are two production wells on the same pad in Dieng Geothermal Field, Indonesia. In early 2019, both wells were offline with 0 psig of WHP (Well Head Pressure). During the production period, HCE-A WHP is mimicking the HCE-C WHP. This response …
View paper: Lesson Learned: Well Logging Analysis to Interpret Shallow Connection Between Two Wells in Dieng Geothermal Field, Indonesia
PDF: Lesson Learned: Well Logging Analysis to Interpret Shallow Connection Between Two Wells in Dieng Geothermal Field, Indonesia (1606 KB)
-
A. Ashat, R.H. Ridwan, W. Prabata, J. Situmorang, Elfina, S. Adityawan, R.F. Ibrahim
·
New Zealand Geothermal Workshop
·
2019
·Session 3.1 – Modelling and Simulation 3
Dieng Geothermal Field has been operated for 17 years with installed capacity of 60 MW. Next target, Dieng field will be developed for additional 2x55 MW. For development purposes, numerical model is used to evaluate initial permeability and temperature …
View paper: NUMERICAL SIMULATION UPDATE of DIENG GEOTHERMAL FIELD, CENTRAL JAVA, INDONESIA
PDF: NUMERICAL SIMULATION UPDATE of DIENG GEOTHERMAL FIELD, CENTRAL JAVA, INDONESIA (1388KB)
-
Puji SIRAIT, Ruly H. RIDWAN, Alfredo BATTISTELLI
·
Stanford Geothermal Workshop
·
2015
·Reservoir Engineering
Dieng geothermal field is volcanic geothermal reservoir located in Central Java, Indonesia, about 120 km from Semarang the capital city of Central Java Province. Since 2002, Geo Dipa Energi start to operate commercially Dieng Unit 1 with installed capacity 60 …
View paper: Modeling for Development Capacity of Dieng Geothermal Field, Indonesia
PDF: Modeling for Development Capacity of Dieng Geothermal Field, Indonesia (1588 KB)
-
Khasani, Sugiyono, Joko WALUYO, Fauzun and Ruly Husnie RIDWAN
·
Indonesian Geothermal Association Conference
·
2014
… cold brine injection system in managing liquid disposal at Dieng geothermal field was adopted to minimize the operational problems due to the presence of solid deposition. However, this attempt seemed not to be effective due to the intensive scale rate …
View paper: Hydraulic Analysis of Brine Reinjection Pump Systems at Dieng Geothermal Field, Central Java
PDF: Hydraulic Analysis of Brine Reinjection Pump Systems at Dieng Geothermal Field, Central Java (368 KB)
-
Zainal I. Bachrun, Soeroso and Ardi Suwana
·
World Geothermal Congress
·
1995
·SECTION 7 - Field Management and Monitoring
Well Dieng-2, drilled in 1979, has been used as a steam producer for the 2 MWe non condensing turbine since 1981. Recently the well exhibited some rather strange phenomena, where as the wellhead pressures became erratic during a certain interval although the …
View paper: Twelve Years Exploitation History of Well Dieng-2, Dieng Geothermal Field, Indonesia
PDF: Twelve Years Exploitation History of Well Dieng-2, Dieng Geothermal Field, Indonesia
-
Bonar Tua Halomoan MARBUN, Ruly HUSNIE, Samuel Zulkhifly SIINAGA, Batara Pande SILALAHI, Bayu Aji PURBANTANU
·
World Geothermal Congress
·
2020
·Drilling and Completion Technology
… performance of drilling geothermal well HCE-28A in Field Dieng, Indonesia. The well is characterized with high temperature up to 316oC, pressure up to 15.7 MPa, presence of corrosive substances (CO2, H2S, and chloride) and environment (pH 4-5), and hard …
View paper: Improved Bottom Hole Assembly Design at Field Dieng, Indonesia
PDF: Improved Bottom Hole Assembly Design at Field Dieng, Indonesia (660 KB)
-
Gloria Gladis SONDAKH, Bjarni PALSSON
·
World Geothermal Congress
·
2020
·Business Strategies
Dieng is one of the prospected geothermal fields in Indonesia with an estimated field development potential at 350 MW. At present, one 60 MW power plant unit has been installed and the current production is around 46 MW. Dieng geothermal power plant is owned …
View paper: Dieng Geothermal Project: Risk Assessment for the Decision on 60 MW Expansion
PDF: Dieng Geothermal Project: Risk Assessment for the Decision on 60 MW Expansion (839 KB)
-
Marchel Christian SUPIJO, Ichwan Agusta ELFAJRIE, Zahratul KAMILA, ELFINA, Reza Jamil FAJRI, Julia Satriani ALIBAZAH, Aditya Yudha KENCANA, Muhammad Istiawan NURPRATAMA, Ali ASHAT
·
Stanford Geothermal Workshop
·
2024
·Reservoir Engineering
PT Geo Dipa Energi (Persero) started developing Dieng Geothermal Field in 2002 with installed plant capacity of 60 MWe. Several Dieng numerical models have been developed in 2006, 2013, and 2019. The latest Dieng numerical model was built in 2019 as the basis …
View paper: Dieng Reservoir Numerical Model: A Robust Update
PDF: Dieng Reservoir Numerical Model: A Robust Update (3096 KB)