Malcolm A. Grant
·
Stanford Geothermal Workshop
·
2008
·Reservoir Engineering
… of drilling, and expected well performance. Using a decision tree of possible actions (drill/accept/sidetrack), drilling costs, and measurements of well injectivity, decision criteria based on injectivity are defined.
View paper: Decision Tree Analysis of Possible Drilling Outcomes to Optimise Drilling Decisions
PDF: Decision Tree Analysis of Possible Drilling Outcomes to Optimise Drilling Decisions (54KB)
-
MUCHAMAD Harry, Jantiur SITUMORANG, PRABATA Welly
·
Stanford Geothermal Workshop
·
2021
·Reservoir Engineering
… comparison against ANN (the most complex algorithm) and Decision Tree Regressor (the highest R squared during training process) is also provided.
View paper: A New Machine Learning Algorithm for Production Well Analysis
PDF: A New Machine Learning Algorithm for Production Well Analysis (3239 KB)
-
Dorman PURBA, Daniel W. ADITYATAMA, Rony P. NUGRAHA, Githa P. RIZKIANI, Rayhan IZZAT, Vicky R. CHANDRA, Budi KRISTIANTO
·
Stanford Geothermal Workshop
·
2021
·Drilling
The Indonesian government has just revised the national target for the utilization of geothermal energy from 7,200 MW in 2025 to 7,000 MW in 2030. Unfortunately, this revision does not necessarily eliminate the main challenge of geothermal development, which …
View paper: Expediting Geothermal Exploration in Indonesia: Should We Consider Slimhole Drilling?
PDF: Expediting Geothermal Exploration in Indonesia: Should We Consider Slimhole Drilling? (1357 KB)
-
K.M. Mackenzie, M.W. Steffen and R. Phillips
·
New Zealand Geothermal Workshop
·
2012
·07. Geothermal Engineering - Drilling and Well Testing
In 2010 Ram Power commenced a drilling programme to secure additional field production and injection capacity required for the San Jacinto 72 MWe expansion project. This involved the drilling of 5 new production wells and 1 new injection well to provide the …
View paper: Success of Multiple Leg Well Completions at the San Jacinto Tizate Geothermal Field, Nicaragua
PDF: Success of Multiple Leg Well Completions at the San Jacinto Tizate Geothermal Field, Nicaragua (478KB)
-
K.M. Mackenzie, M.W. Steffen and R. Phillips
·
ARGeo
·
2012
·Drilling
In 2010 Ram Power commenced a drilling programme to secure additional field production and injection capacity required for the San Jacinto 72 MWe expansion project. This involved the drilling of 5 new production wells and 1 new injection well to provide the …
View paper: Success of Multiple-leg Well Completions at the San Jacinto-Tizate Geothermal Field, Nicaragua
PDF: Success of Multiple-leg Well Completions at the San Jacinto-Tizate Geothermal Field, Nicaragua (525KB)
-
C. Fichter, G. Falcone, K. M. Reinicke, C. Teodoriu
·
Stanford Geothermal Workshop
·
2011
·HDR/EGS
The implementation of renewable energy sources, and geothermal energy in particular, is becoming increasingly important in Germany. However, geothermal power generation is a high risk, capital intensive technology and its future use will depend on how …
View paper: Probabilistic Analysis of Failure Risk in the Primary Geothermal Cycle
PDF: Probabilistic Analysis of Failure Risk in the Primary Geothermal Cycle (2199KB)