Skip to content
International Geothermal Association Conference Paper Database Live

Searches title, authors, abstract, keywords and session. Use "quotes" for an exact phrase.

Advanced search

All filled fields must match. Conference and year are added to the filters on the left.

Filters

Show filters
Conference
Year
–

1–15 of 15 papers

  1. High-Temperature Corrosion Testing Facility for Coating Materials in Simulated Geothermal Environment

    Kovalov, Danyil; Prikryl, Jan; Boake, Gifty Oppong; Thornhallson, Andri Isak; karlsdottir, Sigrun Nanna · Geothermal Resources Council Transactions · 2019 ·Equipment design; Protective coatings; Corrosion; Durability

    View paper: High-Temperature Corrosion Testing Facility for Coating Materials in Simulated Geothermal Environment Download unavailable

  2. Preliminary Corrosion Testing of Nickel Alloys in Simulated High Temperature Geothermal Environmenty

    Andri Í. THORHALLSSON, Tindur JONSSON, Andri STEFANSSON, Sigrún Nanna KARLSDOTTIR · Stanford Geothermal Workshop · 2017 ·General

    … pH level of 2.5-3. To gain more understanding on the corrosion behavior of several alloys at saturation and superheated conditions in deep geothermal wells, preliminary testing of highly corrosion resistant nickel alloys, UNS N06625 and N10276, was …

    View paper: Preliminary Corrosion Testing of Nickel Alloys in Simulated High Temperature Geothermal Environmenty PDF: Preliminary Corrosion Testing of Nickel Alloys in Simulated High Temperature Geothermal Environmenty (2033 KB)

  3. Development of New Field Testing Tools for Geothermal Power Plant Risk Assessment of Corrosion and Scaling

    K. Osato, M. Sato, K. Kasai, M. Omae, N. Yanagisawa, K. Sakura, and K. Lichti · New Zealand Geothermal Workshop · 2017 ·Session 3.2 Scaling

    … tools for geothermal power plant risk assessment of corrosion and scaling under NEDO’s “Research and Development of Geothermal Power Generation Technology Program”. The first tool is the portable flow loop corrosion tester. The second one is the …

    View paper: Development of New Field Testing Tools for Geothermal Power Plant Risk Assessment of Corrosion and Scaling PDF: Development of New Field Testing Tools for Geothermal Power Plant Risk Assessment of Corrosion and Scaling (1704KB)

  4. Surface Corrosion and Stress Corrosion Cracking of Metals in The Geysers Known Geothermal Resource Area, U.S.A.

    Rios-Castellon, Lorenzo; Morita, Masuo · Geothermal Resources Council Transactions · 1981 ·Corrosion; Stress corrosion cracking; Durability testing

    This summary presents the procedures and results of a field corrosion test performed at the Geyser, California. The materials tested included carbon an low alloy steels, ferritic and martensitic chromium SS, chromium nickel austenitic SS and several coating, …

    View paper: Surface Corrosion and Stress Corrosion Cracking of Metals in The Geysers Known Geothermal Resource Area, U.S.A. Download unavailable

  5. Apparatus for Studying the Corrosion Resistance of Alloys in High Temperature Geothermal Well Environment

    Bente Cecilie KROGH, Lars DJUPVIK, Hans HUSBY, Marion SEIERSTEN and Morten TJELTA · World Geothermal Congress · 2020 ·Corrosion and Scaling

    An apparatus and experimental procedures for studying the corrosion behaviour of commercial corrosion resistant alloys (CRAs) are described. Harsh environment in high temperature geothermal wells was tried simulated with a field-relevant test fluid at low pH, …

    View paper: Apparatus for Studying the Corrosion Resistance of Alloys in High Temperature Geothermal Well Environment PDF: Apparatus for Studying the Corrosion Resistance of Alloys in High Temperature Geothermal Well Environment (1081 KB)

  6. Considerations in the Testing and Selection of Materials for Corrosive Geothermal Environments

    Amend, Bill · Geothermal Resources Council Transactions · 2009 ·Corrosion; Stress corrosion cracking

    … of various manufacturing and fabrication practices on corrosion resistance, and 4. The ability of common inspection practices to detect the degradation so that it can be mitigated before failure occurs. This paper describes the process of selecting …

    View paper: Considerations in the Testing and Selection of Materials for Corrosive Geothermal Environments Download unavailable

  7. Long Range Non-Destructive Testing for Geothermal Piping

    Berndt, M. L.; Philippacopoulos, A. J. · Geothermal Resources Council Transactions · 2002 ·Non-Destructive Testing; Corrosion; Erosion corrosion; Pipel

    View paper: Long Range Non-Destructive Testing for Geothermal Piping Download unavailable

  8. High Temperature and High Pressure Testing of Well Casing Materials for Superhot Geothermal Wells

    Sigrun N. Karlsdottir, Gifty Oppong Boakye, Daniel Agbonluai Ijegbai, María Y. Thrainsdottir, Erlend · World Geothermal Congress · 2026

    … CO₂, H₂S, and HCl. These conditions can lead to increased corrosion and erosion-corrosion of well casing materials. To ensure the durability of casing materials, corrosion testing under harsh conditions—high temperature, high pressure, and corrosive …

    View paper: High Temperature and High Pressure Testing of Well Casing Materials for Superhot Geothermal Wells PDF: High Temperature and High Pressure Testing of Well Casing Materials for Superhot Geothermal Wells

  9. Cfd Modelling of Corrosion Test Loops for Geothermal Fluid Applications

    K. Lichti, R. Julian, C. Davies, B. Fletcher, K. Osato, M. Sato, K. Kasai, N. Yanagisawa, K. Sakura · New Zealand Geothermal Workshop · 2020 ·Session 5.2 Above Ground Technology 3

    Small bore corrosion test loops in side streams have been commonly used for many years in the oil and gas industry for cooling water corrosion monitoring. This work describes a high temperature flowing brine test loop for on-line Electrical Resistance, Linear …

    View paper: Cfd Modelling of Corrosion Test Loops for Geothermal Fluid Applications PDF: Cfd Modelling of Corrosion Test Loops for Geothermal Fluid Applications (681KB)

  10. Field-Based Material Test Rig for Geothermal Orc Plant Components

    H. Heinzel, B. Habib, M. Karpenko · New Zealand Geothermal Workshop · 2016 ·1.2

    Scaling, also known as fouling, and corrosion are serious problems in geothermal applications. In a binary plant, the components most affected by these phenomena are the primary heat exchangers or evaporators which are in direct contact with the geothermal …

    View paper: Field-Based Material Test Rig for Geothermal Orc Plant Components PDF: Field-Based Material Test Rig for Geothermal Orc Plant Components (528KB)

  11. DEVELOPMENT OF A FIELD-BASED MATERIALS TEST-RIG

    H. Heinzel, B. Habib, M. Karpenko · New Zealand Geothermal Workshop · 2015 ·Session 1B: Above Ground

    Scaling also known as fouling and corrosion is a serious problem in geothermal applications. In a binary plant, the components most affected are the primary heat exchangers which are in direct contact with the geothermal fluid on the one side and the binary …

    View paper: DEVELOPMENT OF A FIELD-BASED MATERIALS TEST-RIG PDF: DEVELOPMENT OF A FIELD-BASED MATERIALS TEST-RIG (169KB)

  12. Cyclic Polarization Studies on Clad and Thermal Sprayed Ni-Base Alloys in Synthetic Geothermal Brine

    Berndt, M. L.; Otterson, D. M. · Geothermal Resources Council Transactions · 2000 ·Scaling; Corrosion; Nickel; Clad Materials; Thermal Spraying

    View paper: Cyclic Polarization Studies on Clad and Thermal Sprayed Ni-Base Alloys in Synthetic Geothermal Brine Download unavailable

  13. Development of Geothermal Well Completion Systems -- II

    Nelson, E. B.; Eilers, L. H.; Moran, L. K.; Spangle, L. B.; Simpson, B. E. · Geothermal Resources Council Transactions · 1979 ·Cementing; Well casing; Durability testing

    Cementing of geothermal wells is of special interest due to the associated high temperature corrosive fluids and fragile formations. Systems used for cementing conventional oil and gas wells are not necessarily suitable in harsh geothermal environments and …

    View paper: Development of Geothermal Well Completion Systems -- II Download unavailable

  14. Design, manufacturing and commissioning of the ECOGI’s heat exchangers at Rittershoffen (France): a case study

    Ravier, G; Huttenloch, P; Scheiber, J; Perrot, V; Sioly, J-L · European Geothermal Congress · 2016 ·Technology and Best practice – Direct Uses

    The purpose of this paper is to present the design, the manufacturing and the commissioning of the heat exchangers (HEX) of the Rittershoffen geothermal plant. This plant is located in the Rhine graben and is design to deliver a power of 25 MWth to the …

    View paper: Design, manufacturing and commissioning of the ECOGI’s heat exchangers at Rittershoffen (France): a case study PDF: Design, manufacturing and commissioning of the ECOGI’s heat exchangers at Rittershoffen (France): a case study (728KB)

  15. Reservoir Behaviour and Borehole Processes During EGS Operation: Experiences from Three Years of Production and Injection at the Groß Schönebeck Site

    Jan HENNINGES, Guido BLÖCHER, Stefan KRANZ, Simona REGENSPURG, Thomas REINSCH, Ali SAADAT, Günter ZIMMERMANN, Ernst HUENGES · World Geothermal Congress · 2015 ·EGS - Enhanced Geothermal Systems

    At the Groß Schönebeck site, Germany, an Enhanced Geothermal System (EGS) has been created in Lower Permian (Rotliegend) volcanic and sedimentary rocks. Short-term production tests have shown success of the applied hydraulic stimulation treatments, with an up …

    View paper: Reservoir Behaviour and Borehole Processes During EGS Operation: Experiences from Three Years of Production and Injection at the Groß Schönebeck Site PDF: Reservoir Behaviour and Borehole Processes During EGS Operation: Experiences from Three Years of Production and Injection at the Groß Schönebeck Site (684 KB)

Papers are freely accessible. Copyright remains with the authors and conference organisers as stated on each paper.

IGA Conference Paper Database · New search