Basoeki, Mohammed; Radja, Vincent T.
·
Geothermal Resources Council Transactions
·
1979
·Power plant design and operation; Economics; Environmental a
Kawah Kamojang geothermal field is located in West Java, 30 km southwest of Bandung, West Java, Indonesia, at an altitude of approximately 1500 m. Climatically, the region is typically tropical with a wet monsoon season from October to April. Production …
View paper: Towards the Construction and Environmental Impacts of the Kamojang Geothermal Power Project, West Java, Indonesia
Download unavailable
-
Mansure, A. J.; Blankenship, D. A.
·
Geothermal Resources Council Transactions
·
2011
·Drilling; Well completion; Economics
Geothermal well construction costs are critical to geothermal development. Before 2004 well construction costs were relatively stable. Since 2004 well construction costs have changed significantly in response to economic changes. Thus, the need to update …
View paper: Geothermal Well Cost Update 2011
Download unavailable
-
Mansure, A. J.; Blankenship, D. A.
·
Geothermal Resources Council Transactions
·
2010
·Drilling; Economics
Geothermal well construction costs are critical to future geothermal development including both hydrothermal and Engineered Geothermal Systems (EGS). In 2008 geothermal well construction costs were investigated and reported to the Geothermal Resources …
View paper: Geothermal Well Cost Update 2010
Download unavailable
-
Mansure, A. J.; Blankenship, D. A.
·
Geothermal Resources Council Transactions
·
2009
·Drilling; Economics
Geothermal well construction costs are critical to future geothermal development including both hydrothermal and Engineered Geothermal Systems (EGS). Cost analyses presented at last year’s Geothermal Resources Council were made before the financial crises of …
View paper: Geothermal Well Cost Update 2009
Download unavailable
-
Mansure, A. J.; Blankenship, D. A.
·
Geothermal Resources Council Transactions
·
2008
·Drilling; Well completion; Economics
Analyses of geothermal well construction costs are important to our understanding of future geothermal well construction including Engineered Geothermal Systems (EGS). Past work focused on analyses of Sandia well cost data and predicting future geothermal …
View paper: Geothermal Well Cost Analyses 2008
Download unavailable
-
Allegrini, G.; Cappetti, G.
·
Geothermal Resources Council Transactions
·
1990
·Economics; Drilling; Power plant design and operation; Compu
… possible in order to contain they tie up of capital in the construction activities. For this purpose, a series of choices has been made regarding the constructional standardization of plants and the adoption of organizational criteria that allow cost …
View paper: Economic Analysis of Geothermal Projects
Download unavailable
-
Kitz, Kevin; Elliott, Ryan; Spanswick, Ian
·
Geothermal Resources Council Transactions
·
2012
·Equipment design; Power plant cooling; Condensers; Economics
… of an additional $3.1 million dollars. While the capital costs were higher, specific design elements were implemented to offset these additional capital costs. Computational fluid dynamics (CFD) was used to show that the large fan design virtually …
View paper: Economic and Performance Benefits Resulting from the Use of Large Diameter Fans on Air Cooled Heat Exchangers (A Case Study in the Use of Large Fan Air Cooled Condensers at the Neal Hot Springs Geothermal Power Plant, Oregon)
Download unavailable
-
Mansure, A. J.; Bauer, S. J.; Livesay, B. J.; Petty, S.
·
Geothermal Resources Council Transactions
·
2006
·Drilling; Economics
Continuing analyses of geothermal well costs have improved our understanding of estimating costs of future geothermal well, in particular the costs to be expected for first generation Engineered Geothermal Systems (EGS). Past work focused on analysis of well …
View paper: Geothermal Well Cost Analyses 2006
Download unavailable
-
Hoyer, Dan; Kitz, Kevin; Gallup, Darrell
·
Geothermal Resources Council Transactions
·
1991
·Power plant design and operation; Effluent abatement; Hydrog
… cost per Megawatt was reduced by minimizing the design and construction time and maximizing the energy utilization of the produced brine. Unocal is also preparing for future development in the Salton Sea field and elsewhere with commercial scale testing of …
View paper: Salton Sea Unit 2: Innovations and Successes
Download unavailable
-
Entingh, Daniel J.; Keimig, Mark A.
·
Geothermal Resources Council Transactions
·
1981
·Economics; Computer modeling
… is a user interactive computer model that estimates the costs and cash flow patterns of geothermal electric development projects. It was developed as a financial analysis tool for the U.S. Department of Energy Geothermal Loan Guaranty Program. It contains …
View paper: Geothermal Electric Cash Flow Model (GCFM)
Download unavailable
-
Mansure, A. J.; Blankenship, D. A.
·
Geothermal Resources Council Transactions
·
2013
·Drilling; Economics
View paper: Geothermal Well Cost Update 2013
Download unavailable
-
Hibara, Yutaka; Kondo, Takeshi; Suzuki, Tetsuya
·
Geothermal Resources Council Transactions
·
1990
·Power plant design and operation; Flash steam power generati
A binary cycle using a low boiling point medium such as freon and isobutane is generally applied to geothermal power generating from low temperature geothermal resource. However, in order for binary cycle geothermal power generation to gain ground some …
View paper: Vacuum Flash Cycle Geothermal Power Generation for Low Temperature Resource
Download unavailable
-
Babione, Robert A.; Coury, Glenn E.
·
Geothermal Resources Council Transactions
·
1979
·Well pumps; Flash steam power generation; Two phase flow; Fe
A study has been completed which demonstrates that, for parameters and conditions typical of current state of the art geothermal electrical power generation, there is a very high probability that pumping will reduce the production capabilities of an otherwise …
View paper: A Technical Evaluation of Pumping Vs. Naturally Flashing Geothermal Well Production
Download unavailable