Searches title, authors, abstract, keywords and session. Use "quotes" for an exact phrase.
All filled fields must match. Conference and year are added to the filters on the left.
Suarez Arriaga, Mario Cesar; Samaniego Verduzco, Fernando · Geothermal Resources Council Transactions · 2003 ·Reservoir Engineering; Subsidence; Fractures; HDR/EGS; Volca
View paper: A Practical Model to Estimate The Pore-Fracture Deformation in Dry/Wet Rocks and in Enhanced Geothermal Systems Download unavailable
Weber, Lawrence; Emerson, Eric; Harris, Kirk; Brothers, Lance · Geothermal Resources Council Transactions · 1998 ·Drilling; Well completion; Cementing; Corrosion; Equipment d
View paper: The Application of a New Corrosion Resistant Cement in Geothermal Wells Download unavailable
Wagg, Brian; Slack, Maurice; Kaiser, Trent; DeGeer, Duane · Geothermal Resources Council Transactions · 1997 ·Well casing; Software
View paper: Identification of Casing String Failure Modes Using Caliper Data Download unavailable
Kamenosono, Hiroyuki; Uchida, Toshihiro; Akaku, Kohei; Yanagisawa, Norio; Miyazaki, Shin-ichi; Doi, Nobuo · Geothermal Resources Council Transactions · 1997 ·Deep drilling; Drilling; Exploration; Microseismicity; Reser
View paper: Information on the Kakkonda Deep Geothermal Reservoir Obtained by Side-track Drilling of WD-1 Download unavailable
Salonga, N. D.; Aragon, G. M.; Nogara, J. B.; Sambrano, B. G. · Geothermal Resources Council Transactions · 1996 ·Exploration; Geochemical surveys; Isotopes; Hydrogeology
View paper: Applications of Stable Isotopes in Hydrological Studies of Mt. Apo Geothermal Field, Philippines Download unavailable
Cocks, George G.; Dreesen, Donald S.; Gill, Patrick J.; Root, Ronald L. · Geothermal Resources Council Transactions · 1988 ·Well completion; Well casing; Cementing; HDR/EGS
As part of reporting and sidetracking EE-2 geothermal well, a number of cementing operations were successfully carried out. These included; a) plugging back of EE-2 below the proposed side track site, b) cement behind casing at 10220-24 ft, c) cement behind …
View paper: Cementing Operations on Fenton Hill During FY87, 1 October, 1986 to 30 September, 1987 Download unavailable