-
Danilo IBARRA, Andrés LLORET, Danilo ASIMBAYA
·
World Geothermal Congress
·
2020
·Societal and Cultural Aspects
… stakeholders and the National geothermal developer of the Chachimbiro geothermal project in the Province of Imbabura. It is the country´s pioneer geothermal initiative since 2015 with a potential of 50 MWe that was estimated after the completion of …
View paper: Chachimbiro Geothermal Prospect: Social Outlook After the First Deep Drilling in Ecuador
PDF: Chachimbiro Geothermal Prospect: Social Outlook After the First Deep Drilling in Ecuador (3557 KB)
-
Byron PILICITA, Gunnlaugur EINARSSON, MálfrÃður ÓMARSDÓTTIR
·
World Geothermal Congress
·
2020
·Resource Assessment
The Chachimbiro Geothermal System is the most important Geothermal Prospect in Ecuador. Various geothermal models have been presented based upon geological, geochemical and geophysical data collected at different epochs. Currently, Chachimbiro Prospect is …
View paper: A 3D Model of the Chachimbiro Geothermal System in Ecuador
PDF: A 3D Model of the Chachimbiro Geothermal System in Ecuador (3606 KB)
-
Fabrizio GHERARDI, Nicolas SPYCHER
·
Stanford Geothermal Workshop
·
2014
·Geochemistry
… Occidental), about 70 km NNE of Quito, Ecuador, the Chachimbiro thermal area has been investigated for geothermal prospecting since the early 90’s. Based on a very preliminary location of geothermal phenomena at the surface, chemical geothermometry …
View paper: Application of Integrated Multicomponent Geothermometry at the Chachimbiro Thermal Area, a Difficult Geothermal Prospection Case
PDF: Application of Integrated Multicomponent Geothermometry at the Chachimbiro Thermal Area, a Difficult Geothermal Prospection Case (765 KB)
-
Aguilera, Eduardo
·
Geothermal Resources Council Transactions
·
1998
·Exploration
View paper: The Chalupas and Chachimbiro Geothermal Fields in Ecuador
Download unavailable
-
Bernardo Beate, Andres Lloret, Danilo Ibarra, Gorki Ruiz
·
World Geothermal Congress
·
2026
·Country Updates
… a combined averaged technical potential of 303 MWe namely: Chachimbiro (81MWe), Chacana-Jamanco (13 MWe), Chacana-Cachiyacu (39 MWe) and Tufiño-Chiles (170 MWe), based on initial surface prefeasibility-stage studies and reasonably well constrained Conceptual …
View paper: Country Update: Ecuador 2023-2026
PDF: Country Update: Ecuador 2023-2026 (1611KB)
-
Bernardo Beate, Matilde Urquizo, Andres Lloret, Mateo Acosta, Elena Angulo
·
World Geothermal Congress
·
2023
·Country Updates
… 5.Coastal Fore-arc basin, and 6. Oriente Foreland basin. Chachimbiro, located in play #3, is the first priority prospect among eleven in the Geothermal Plan launched by the government in 2010. It has completed the prefeasibility stage, and a successful …
View paper: Geothermal Country Update for Ecuador: 2020 - 2023
PDF: Geothermal Country Update for Ecuador: 2020 - 2023 (2,54 MB)
-
Matilde URQUIZO, Francisco ASTUDILLO, Danilo ASIMBAYA
·
World Geothermal Congress
·
2020
·Case Histories
… a totally ground breaking experience for Ecuador. Chachimbiro project was studied since 80´s when INECEL collected information and classified some of the geothermal projects until the geothermal department was closed in the 90´s. The former …
View paper: Pec 1, First Exploration Well Experiences in Ecuador
PDF: Pec 1, First Exploration Well Experiences in Ecuador (1398 KB)