Skip to content
International Geothermal Association Conference Paper Database Live

Searches title, authors, abstract, keywords and session. Use "quotes" for an exact phrase.

Advanced search

All filled fields must match. Conference and year are added to the filters on the left.

Filters

Show filters
Conference
Year
–

1–25 of 60 papers

  1. Identifying Casing While Drilling (CWD) Potential in Geothermal Scenario Along with Economics

    Dipal PATEL, Manan SHAH, Vivek THAKAR, Anirbid SIRCAR · Stanford Geothermal Workshop · 2019 ·Drilling

    … of a well into the formation containing high-temperature. Casing While Drilling (CWD), a method of simultaneous drilling and casing a wellbore with tubular called ‘casing’, evolves as an answer to arrest numerous drilling problems by decreasing the flat …

    View paper: Identifying Casing While Drilling (CWD) Potential in Geothermal Scenario Along with Economics PDF: Identifying Casing While Drilling (CWD) Potential in Geothermal Scenario Along with Economics (480 KB)

  2. INTEGRATED ENGINEERING ANALYSIS TO SUPPORT SUCCESSFUL UTILIZATION OF CASING DRILLING IN GEOTHERMAL WELLS

    R.Y. Mardiana, B. Noviasta · New Zealand Geothermal Workshop · 2019 ·Session 4.1 – Drilling and above ground technology 1

    Casing drilling has become a common operation for drilling a well nowadays. Instead of using a drill pipe to transfer the energy from the surface to the drill bit, this operation uses casing, so when the bit reaches the end of the section, the casing is …

    View paper: INTEGRATED ENGINEERING ANALYSIS TO SUPPORT SUCCESSFUL UTILIZATION OF CASING DRILLING IN GEOTHERMAL WELLS PDF: INTEGRATED ENGINEERING ANALYSIS TO SUPPORT SUCCESSFUL UTILIZATION OF CASING DRILLING IN GEOTHERMAL WELLS (1145KB)

  3. Casing Drilling Reduces Lost Circulation Problems

    Tessari, Robert M.; Warren, Tommy · Geothermal Resources Council Transactions · 2003 ·Drilling - Well Construction; Casing Drilling; Lost Circulat

    View paper: Casing Drilling Reduces Lost Circulation Problems Download unavailable

  4. Feasibility Study of Casing While Drilling Application on Geothermal Drilling Operation

    Bonar MARBUN, Widiyanto WIDIYANTO, Yudhistira ADINUGRATAMA, Bramantyo Eko KURNIANTO · Stanford Geothermal Workshop · 2014 ·Emerging Technology

    … pipe. One way to overcome these problems is drilling with Casing While Drilling (CWD) method. CWD has been widely applied in the oil and gas drilling operation. In principle, CWD is a drilling method by replacing the use of drill pipe with casing as the …

    View paper: Feasibility Study of Casing While Drilling Application on Geothermal Drilling Operation PDF: Feasibility Study of Casing While Drilling Application on Geothermal Drilling Operation (1149 KB)

  5. PLASMABIT – Innovative drilling and casing system

    Kocis, Kristofic, Kocis · European Geothermal Conference · 2013 ·7 Petrothermal Systems (PS1-3)

    … to drill with a constant speed, without need to change a drilling bit on regular basis, working in a HPHT environment. Therefore the drilling cost using PLASMABIT is rising only linearly with the drilling depth. As a result, the overall drilling cost, …

    View paper: PLASMABIT – Innovative drilling and casing system PDF: PLASMABIT – Innovative drilling and casing system (244 KB)

  6. Casing Protection for Geothermal Wells

    Gollmyer, Eric; Mitchell, Sarah; Bailey, Alan; Rickard, Bill; Pye, Stephen · Geothermal Resources Council Transactions · 2011 ·Drilling; Corrosion; Well casing

    … life often necessitate high cost, corrosion resistant casing materials. Unfortunately, these materials can be susceptible to wear. Therefore, casing protection becomes vital in providing a long service life. Wear must be minimized, because the resulting …

    View paper: Casing Protection for Geothermal Wells Download unavailable

  7. Puna Geothermal Venture, Hawaii--2005 Drilling Program

    Spielman, Paul; Rickard, William; Teplow, William · Geothermal Resources Council Transactions · 2006 ·Drilling; Foam cement; ICM; ROP; well development; casing pa

    … with difficulties and successfully complete the wells. A casing patch was used to repair parted casing. Foam cement was used for the intermediate casing and foam cement was reverse circulated for the production casing. Mud motors were used for most of the …

    View paper: Puna Geothermal Venture, Hawaii--2005 Drilling Program Download unavailable

  8. Casing Failure Modes in Geothermal Wells

    Snyder, Robert E. · Geothermal Resources Council Transactions · 1979 ·Drilling; Well casing; High temperature reservoirs; Corrosio

    … of drilling and cementing problems make geothermal well casing design, installation and maintenance significantly different than for oil and gas wells of similar depths. This review presents common problems that operators have experienced with tubulars …

    View paper: Casing Failure Modes in Geothermal Wells Download unavailable

  9. New Challenges in casing design for deep geothermal well

    David Hernandez · World Geothermal Congress · 2023 ·Drilling and Completion Technology

    … the different areas to reengineer the selection of the casing settling depth with a new well structure, by incorporating a contingency casing, a new diameter using an integral connection. This configuration is planned to isolate areas that cause …

    View paper: New Challenges in casing design for deep geothermal well PDF: New Challenges in casing design for deep geothermal well (0,63 MB)

  10. Rewriting the Limits for Deep Geothermal Drilling: Direct Energy Drilling Using Millimeter Wave Technology

    Carlos ARAQUE, Matt HOUDE, Ken OGLESBY, Paul WOSKOV · World Geothermal Congress · 2020 ·Drilling and Completion Technology

    … of penetration (ROP) by a factor of 10 or more, enable casing-while-drilling, and access depths exceeding 10-20 km. In this paper, we revisit the concept of direct energy drilling via millimeter waves, pioneered at the MIT Plasma Science Fusion Center …

    View paper: Rewriting the Limits for Deep Geothermal Drilling: Direct Energy Drilling Using Millimeter Wave Technology PDF: Rewriting the Limits for Deep Geothermal Drilling: Direct Energy Drilling Using Millimeter Wave Technology (1599 KB)

  11. A Thermal Casing Connection Test to Avoid Casing Failure in Geothermal Wells

    Boga ISA, Fahmi SUNGKAR, Hendra SIMANJUNTAK · World Geothermal Congress · 2020 ·Drilling and Completion Technology

    Determining the proper casing and its connection for geothermal wells is very crucial. The casing and its connection experience various loads not only during drilling operations but also during production operations. In the past, there were numerous papers …

    View paper: A Thermal Casing Connection Test to Avoid Casing Failure in Geothermal Wells PDF: A Thermal Casing Connection Test to Avoid Casing Failure in Geothermal Wells (1037 KB)

  12. Prevention of Casing Failures in Ultra-Deep Geothermal Wells (Germany)

    David LENTSCH, Klaus DORSCH, Natascha SONNLEITNER, Achim SCHUBERT · World Geothermal Congress · 2015 ·Drilling and Completion Technology

    … fluids that are produced with high flow rates through the casing string induce additional stresses. Consequently, one of the major problems in the past was casing failures. Therefore, a study was performed to identify the mechanisms and reasons for casing …

    View paper: Prevention of Casing Failures in Ultra-Deep Geothermal Wells (Germany) PDF: Prevention of Casing Failures in Ultra-Deep Geothermal Wells (Germany) (1843 KB)

  13. Innovative Drilling and Completion Concept for Geothermal Applications

    Oppelt, Joachim; Lehr, Jorg · Geothermal Resources Council Transactions · 2012 ·Drilling; Economics; Monobores

    … 2 M EUR per well, can be achieved by applying the monobore casing construction approach. An additional 10% cost savings can be achieved by applying automated closed-loop drilling and reaming systems, which enable an increase of the effective rate of well …

    View paper: Innovative Drilling and Completion Concept for Geothermal Applications Download unavailable

  14. Maximum Discharge of Geothermal Fluids From Slim Holes by Optimizing Casing Designs

    Combs, Jim; Garg, Sabodh K.; Livesay, Billy Joe · Geothermal Resources Council Transactions · 2000 ·Drilling Technology; Slimholes; Liquid Freezones; Casing Des

    View paper: Maximum Discharge of Geothermal Fluids From Slim Holes by Optimizing Casing Designs Download unavailable

  15. Characterization and Modeling of Cements for Geothermal Well Casing Remediation

    Philippacopoulos, A. J.; Berndt, M. L. · Geothermal Resources Council Transactions · 2000 ·Drilling Technology; Well casing; Cementing

    View paper: Characterization and Modeling of Cements for Geothermal Well Casing Remediation Download unavailable

  16. Integrated Analysis of Optimizing Casing Materials Selection of Geothermal Well by Using a Model for Calculating Corrosion Rates

    Novianti EKASARI, Bonar T.H. MARBUN · World Geothermal Congress · 2015 ·Drilling and Completion Technology

    … be maintained as long as possible by performing the well casing design, particularly the selection of the appropriate production casing due to it was the only one casing which is in constant contact with the extracted geothermal fluid. Considering that the …

    View paper: Integrated Analysis of Optimizing Casing Materials Selection of Geothermal Well by Using a Model for Calculating Corrosion Rates PDF: Integrated Analysis of Optimizing Casing Materials Selection of Geothermal Well by Using a Model for Calculating Corrosion Rates (1008 KB)

  17. Why and When Does Casing Fail in Geothermal Wells: a Surprise Question?

    Catalin TEODORIU · World Geothermal Congress · 2015 ·Drilling and Completion Technology

    Casing failures in some geothermal wells cannot be easily explained using simple casing string mechanics. Some of these failures appear to be time dependent while others happen a few hours after the well is brought onto production. The detrimental effect of …

    View paper: Why and When Does Casing Fail in Geothermal Wells: a Surprise Question? PDF: Why and When Does Casing Fail in Geothermal Wells: a Surprise Question? (511 KB)

  18. Controlled Directional Drilling in Kenya and Iceland (Time Analysis)

    Ong’au, Thomas Miyora · Geothermal Resources Council Transactions · 2012 ·Directional drilling

    Directional drilling enables more wells to be drilled from the same pad, allows for fewer rig moves, less surface area disturbance hence making it easier and cheaper to exploit the resource. The technique allows the driller to steer the well to the target …

    View paper: Controlled Directional Drilling in Kenya and Iceland (Time Analysis) Download unavailable

  19. Controlled Directional Drilling in Kenya and Iceland (Time Analysis)

    Miyora Ong'au, Thomas · Geothermal Resources Council Transactions · 2011 ·Directional drilling; Operations management; Economics

    Directional drilling is the most widely used method for drilling geothermal wells due to its various advantages. Drilling more wells from the same pad allows for fewer rig moves, less surface area disturbance as well as making it easier and cheaper to exploit …

    View paper: Controlled Directional Drilling in Kenya and Iceland (Time Analysis) Download unavailable

  20. Advanced Drilling System for Drilling Geothermal Wells - An Estimate of Cost Savings

    John Rowley, Seiji Saito and Roy Long · World Geothermal Congress · 2000 ·Drilling and Completion Technology

    An advanced geothermal drilling system (AGDS) has previously been proposed. This system concept is based on the use of a percussion drilling motor and dual wall reverse circulation drill strings. The concept is based on a merger of the deep drilling …

    View paper: Advanced Drilling System for Drilling Geothermal Wells - An Estimate of Cost Savings PDF: Advanced Drilling System for Drilling Geothermal Wells - An Estimate of Cost Savings (303 B)

  21. Scientific Core Hole Valles Caldera # 2b (VC-2b), New Mexico: Drilling and Some Initial Results

    Gardner, Jamie N.; Hulen, Jeffrey B.; Lysne, Peter; Jacobson, Ron; Goff, Fraser; Nielson, D. L.; Pisto, Larry; Criswell, C. W.; Gribble, R.; Meeker, K.; Musgrave, J. A.; Smith, T.; Wilson, D. · Geothermal Resources Council Transactions · 1989 ·Exploration; Drilling; Core sampling; Geological surveys; St

    … in the U.S. Department of Energy's Continental Scientific Drilling Program efforts in the Valles caldera, was continuously cored to 1,762 km on the western flank of the caldera's resurgent dome in 1988. Bottom hole temperature is about 295°C within …

    View paper: Scientific Core Hole Valles Caldera # 2b (VC-2b), New Mexico: Drilling and Some Initial Results Download unavailable

  22. The Use of Beta-C Titanium for Downhole Production Casing in Geothermal Wells

    Love, William; Cron, Carl; Holligan, David · Geothermal Resources Council Transactions · 1988 ·Well casing; Corrosion; Titanium; Durability testing; Econom

    … Although special consideration must be given to titanium casing string, Beta-C titanium completions are a cost-effective option for geothermal production wells in the Salton Sea field.

    View paper: The Use of Beta-C Titanium for Downhole Production Casing in Geothermal Wells Download unavailable

  23. Redrilling of Well EE-3 at the Los Alamos National Laboratory HDR Project

    Schillo, John C.; Nicholson, Robert W.; Hendron, Robert H.; Thomson, James C. · Geothermal Resources Council Transactions · 1987 ·Drilling; Directional drilling; HRD/EGS; Drill bits

    The successful sidetracking of well EE-3 and the drilling of well EE-3A proved that detailed planning an by adjusting techniques based on previous experience at Fenton Hill, drilling can be accomplished with reduced risk. The primary drilling problems …

    View paper: Redrilling of Well EE-3 at the Los Alamos National Laboratory HDR Project Download unavailable

  24. Insulating Geothermal Well Casings from Thermal Stress with Nitrogen Gas or Nitrogen Foam

    Dreesen, Donald S.; Murphy, Hugh D.; Zyvoloski, George; McEligot, Donald M.; Dash, Zora; Nicholson, Robert N. · Geothermal Resources Council Transactions · 1984 ·HDR/EGS; Nitrogen; Well casing

    … between the wells. Unfortunately, the 9 5/8" of production casing in EE-3 had been pretensioned to 885,000 lbs to accommodate its intended service as a hot water production well. Cool down of the casing was thus limited to only 11°C (20°F) to keep the stress …

    View paper: Insulating Geothermal Well Casings from Thermal Stress with Nitrogen Gas or Nitrogen Foam Download unavailable

  25. The Impact of Common Problems in Geothermal Drilling and Completion

    Carson, Charles C.; Lin, Y. T. · Geothermal Resources Council Transactions · 1982 ·Drilling; Well completion; Lost circulation; Cementing

    Problems that arise in geothermal drilling and completion account for a significant portion of geothermal well costs. In order to evaluate new technologies for combating these problems, the relative frequencies and severities of different problems have been …

    View paper: The Impact of Common Problems in Geothermal Drilling and Completion Download unavailable

1 2 3 Next ›

Papers are freely accessible. Copyright remains with the authors and conference organisers as stated on each paper.

IGA Conference Paper Database · New search