Markos Melaku and Bob Thomasson · ARGeo · 2010 ·Field Development
The Aluto Pilot Geothermal Power Plant was built and commissioned in late 1998 but stopped operation after a very short period due to various technical problems. Failure of the heat exchanger tubes caused the premature shutdown of the OEC unit after about a …
View paper: Rehabilitation of the Aluto Pilot Geothermal Power Plant PDF: Rehabilitation of the Aluto Pilot Geothermal Power Plant (162KB)
Markos Melaku and Merga Tassew · ARGeo · 2008
The Aluto Pilot Geothermal Power Plant was commissioned in late 1998 but stopped operation after a very short period due to various technical problems. Failure of the heat exchanger tubes caused the premature shutdown of the OEC unit after about a year of …
View paper: Rehabilitation of the Aluto Pilot Geothermal Power Plant PDF: Rehabilitation of the Aluto Pilot Geothermal Power Plant (492KB)