-
Marziyeh Kamali, Erik Nickel, Neil Struthers, Norm Sacuta, Brian Brunskill, Zeinab Movahedzadeh
·
World Geothermal Congress
·
2026
The City of Regina is taking the lead among Canadian jurisdictions to become a sustainable municipality by becoming 100% renewable by 2050. The city has adopted an Energy and Sustainability Framework that furthers the commitment to building a sustainable …
View paper: Technical, regulatory, and pore space challenges for geothermal in an urban setting: Examples from the City of Regina Deep Geothermal Project
PDF: Technical, regulatory, and pore space challenges for geothermal in an urban setting: Examples from the City of Regina Deep Geothermal Project
-
Amri ZEIN
·
World Geothermal Congress
·
2020
·Power Generation
Unit 1 Cooling Tower (CT) in Wayang Windu Geothermal Power Plant has been operating since 2000. There were excellent works had been conducted by Star Energy Geothermal (Wayang Windu) team in order to improve the CT performance while assuring the excellent CT …
View paper: Modification of Wayang Windu Unit 1 Cooling Tower to Improve the CT Performance
PDF: Modification of Wayang Windu Unit 1 Cooling Tower to Improve the CT Performance (1444 KB)
-
A. Zein, M. Kuntoaji
·
New Zealand Geothermal Workshop
·
2019
·Session 4.1 – Drilling and above ground technology 1
Unit 1 Cooling Tower (CT) in Wayang Windu Geothermal Power Plant has been operating since 2000. Extensive works have been conducted by Star Energy Geothermal (Wayang Windu) team in order to improve the performance of the CT while assuring excellent …
View paper: MODIFICATION OF UNIT 1 COOLING TOWER (CT) TO IMPROVE THE CT PERFORMANCE IN STAR ENERGY GEOTHERMAL (WAYANG WINDU) LTD
PDF: MODIFICATION OF UNIT 1 COOLING TOWER (CT) TO IMPROVE THE CT PERFORMANCE IN STAR ENERGY GEOTHERMAL (WAYANG WINDU) LTD (698KB)
-
G. Ganjar Zatnika, S. Wisanto, A. Wityasmoro, D. Kurniadi, A. Zein
·
New Zealand Geothermal Workshop
·
2016
·5.5
Corrosion on reinjection pipelines has been renowned as one of the most challenging problem in geothermal plants as also found in Wayang Windu plant. A systematic failure analysis, design appraisal, and corrosion mitigation program have been carried out to …
View paper: Failure Analysis and Mitigation of Corrosion on Condensate Reinjection Pipeline in Wayang Windu Geothermal Power Plant
PDF: Failure Analysis and Mitigation of Corrosion on Condensate Reinjection Pipeline in Wayang Windu Geothermal Power Plant (913kb)
-
Amri ZEIN, Djamaludin KURNIADI
·
World Geothermal Congress
·
2015
·Power Generation
Unit 1 Cooling Tower (CT) fan stack was designed with height of 6 feet and had relatively straight vertical panels which didn’t produce significant velocity recovery. In other hand, due to Wayang Windu Geothermal Plant is located in the mountain; the CT is …
View paper: Unit 1 Cooling Tower Fan Stack Replacement to Improve Cooling Tower Perfomance
PDF: Unit 1 Cooling Tower Fan Stack Replacement to Improve Cooling Tower Perfomance (1589 KB)
-
Amri ZEIN, Wahyu MULYANA, Heribertus DWIYUDHA
·
World Geothermal Congress
·
2015
·Power Generation
Unit 1 steam turbine of Wayang Windu geothermal power plant with capacity 110 MW has been operated since plant commissioning in 2000. Periodic Turn Around (TA) program such as turbine inspection and overhaul was conducted in every 3 years interval. On 2006 …
View paper: 110 MW Geothermal Steam Turbine Rotor Replacement
PDF: 110 MW Geothermal Steam Turbine Rotor Replacement (1873 KB)
-
Amri Zein, Paul A. Taylor, Yudi Indrinanto, Heribertus Dwiyudha
·
World Geothermal Congress
·
2010
·25. Production Engineering and Steam Gathering Systems
During Unit 2 Drilling program in Wayang Windu Geothermal Power Plant, West Java, a well output test was conducted soon after a well was drilled. There are many purposes of well output tests, such as cleaning the well bore from remaining mud or dirt during …
View paper: Portable Rock Muffler Tank for Well Testing Purpose
PDF: Portable Rock Muffler Tank for Well Testing Purpose (397KB)
-
Amri Zein, Paul A. Taylor, Heribertus Dwiyudha
·
World Geothermal Congress
·
2010
·26. Power Generation
The cooling water (CW) design flow to the condenser of Unit 1, 110MWe Wayang Windu Geothermal Power Plant, West Java, as per heat balance is 4639 kg/s. Although this flow was achieved during first commissioning, it reduced quickly in normal operation which …
View paper: Modification of Condenser Nozzle and Cooling Tower Exit Screen to Increase Condenser Performance
PDF: Modification of Condenser Nozzle and Cooling Tower Exit Screen to Increase Condenser Performance (1385KB)