Stefan KRANZ, Stephanie FRICK, Ali SAADAT, Kemal ERBAS, Ernst HUENGES, SUYANTO, Roy BANDORO
·
World Geothermal Congress
·
2020
·Power Generation
In order to successfully demonstrate geothermal binary power plant technology at an Indonesian site and to intensify the know-how transfer in this technology field a German-Indonesian collaboration project has been initiated in 2013 involving GFZ Potsdam …
View paper: Geothermal Binary Demonstration Power Plant Pangolombian-Lahendong, Indonesia
PDF: Geothermal Binary Demonstration Power Plant Pangolombian-Lahendong, Indonesia (1508 KB)
-
Bhakti NURYADIN, Prihadi Setyo DARMANTO, I Made ASTINA, SUYANTO, Bambang Teguh PRASETYO
·
World Geothermal Congress
·
2020
·Power Generation
Geothermal power plant is a power plant that also produces water besides producing power.The water is resulted from condensation process in the condenser and brine as separation process of geothermal fluid in the separator. This study investigates the …
View paper: Study of Implementation of Water Jet Ejector as a Gas Removal System for a Case Study of BPPT 3 MW Geothermal Power Plant
PDF: Study of Implementation of Water Jet Ejector as a Gas Removal System for a Case Study of BPPT 3 MW Geothermal Power Plant (961 KB)
-
Bambang Teguh PRASETYO, SUYANTO, Himawan SUTRIYANTO
·
World Geothermal Congress
·
2020
·Power Generation
BPPT has developed and operated a 3MW Geothermal Power Plant (GPP) of condensing type technology in Kamojang - Indonesia, which is the first prototype GPP manufactured by national companies. The GPP design is based on KMJ-68 well data characteristics, owned …
View paper: Analysis of Performance and Reliability of BPPT 3MW Condensing Type Geothermal Power Plant – Kamojang During 3x24 Hours Continuous Synchronous Testing
PDF: Analysis of Performance and Reliability of BPPT 3MW Condensing Type Geothermal Power Plant – Kamojang During 3x24 Hours Continuous Synchronous Testing (768 KB)
-
Satriyo Nurhanudin WIBOWO, Prasetyo AJI, CAHYADI, SUYANTO, M. Taufiq FATHADDIN, Hari Karyadi OETOMO, Kris PUDYASTUTI, Yusraida Khairani DALIMUNTHE, M.N. Ali AKBAR
·
World Geothermal Congress
·
2020
·Big Data and Data Analytics
The industry has adopted Artificial Intelligence (AI), and it is a significant opportunity for the industry; especially the application of Machine Learning (ML) to improve prediction results, which will affect decision making. The Lahendong Organic Rankine …
View paper: A Robust Prediction Method Based on Artificial Neural Network for Electric Power Production of Organic Rankine Cycle in Lahendong Geothermal Field
PDF: A Robust Prediction Method Based on Artificial Neural Network for Electric Power Production of Organic Rankine Cycle in Lahendong Geothermal Field (1636 KB)
-
Fransiska Atika Indriyani, Maulana Rizki Aditama, Nur Aziz Ribowo, Imam Suyanto
·
Indonesian Geothermal Association Conference
·
2014
AMT (Audio Magneto Telluric) research is done by measuring the fluctuations in the magnetic field and also electric field which has recorded on Earth's surface. The survey is located in Kasihan Village as the part of Non-Seismic Practical work of Geophysics …
View paper: Audio Magnetotelluric to Characterize Geothermal Prospect in Pacitan
PDF: Audio Magnetotelluric to Characterize Geothermal Prospect in Pacitan (417 KB)
-
Sandy IndraPurwagandhi, Indah Islamiaty, Imam Suyanto
·
Indonesian Geothermal Association Conference
·
2014
A research has been conducted to separate regional-residual anomaly in Gravity method. This research is done to process Merapi Volcano data in 1998 using Moving Average and Upward Continuation method. The processing of data utilize computer program such as …
View paper: The Comparison for Separation of Regional-Residual Anomaly Using Moving Average and Upward Continuation Method; Case Study of Merapi Vulcanos’s Gravity Data 1998
PDF: The Comparison for Separation of Regional-Residual Anomaly Using Moving Average and Upward Continuation Method; Case Study of Merapi Vulcanos’s Gravity Data 1998 (472 KB)
-
Imam Suyanto, Sintia Windhi, and Wahyudi
·
World Geothermal Congress
·
2010
·13. Geophysics
VLF and a ground magnetic survey were carried out over the Kelud Caldera, East Java in January 2009. The new lava dome emerged in the November 2007 eruption and filled the western part of the previous caldera. The survey lines are located at the eastern part …
View paper: A Geophysical Characteristic Over Kelud Caldera Post November 2007 Eruption
PDF: A Geophysical Characteristic Over Kelud Caldera Post November 2007 Eruption (1030KB)
-
Bambang Teguh P., Himawan S., Suyanto, Taufan Surana, Lina Agustina, Ridha Yasser, MD. Trisno
·
World Geothermal Congress
·
2010
·26. Power Generation
Design, manufacture and testing of a 2 kW n-pentane turbine were carried out. This project is dedicated to support the study of the 2 kW model of binary cycle power plant using geothermal brine as the energy source. Brine defined in this study is separated …
View paper: Design and Testing of n-Pentane Turbine for 2 kW Model of Binary Cycle Power Plant
PDF: Design and Testing of n-Pentane Turbine for 2 kW Model of Binary Cycle Power Plant (3770KB)
-
Bambang Teguh P., Himawan S., Suyanto, Taufan S., MD Trisno
·
World Geothermal Congress
·
2010
·26. Power Generation
Currently, 100% of brine at direct-steam geothermal power plant is injected into injection wells. Injected brine generally has a temperature higher than 100oC and mass flow rate around hundred of ton/hour. The rapid estimation showed the content of rejected …
View paper: Design and Experimental Validation of Heat Exchangers Equipment for 2 kW Model of Binary Cycle Power Plant
PDF: Design and Experimental Validation of Heat Exchangers Equipment for 2 kW Model of Binary Cycle Power Plant (2876KB)
-
Taufan Surana, Jatmiko P Atmojo, Suyanto, Andri Subandriya
·
World Geothermal Congress
·
2010
·28. Direct Use
As a country with vast potential of high enthalpy geothermal resources, Indonesia has been focusing the development of geothermal energy for electricity generation. On the other hand, Indonesia is also blessed with a huge low-to-medium geothermal resources …
View paper: Development of Geothermal Energy Direct Use in Indonesia
PDF: Development of Geothermal Energy Direct Use in Indonesia (725KB)
-
Suyanto, Taufan Surana, Lina Agustina, and Andri Subandriya
·
World Geothermal Congress
·
2010
·28. Direct Use
Beside for generating electricity, geothermal energy can also be utilized directly in such processes as heating, drying, sterilization, pasteurization, heated swimming pool and hot springs; also known as direct use applications of the geothermal energy. …
View paper: Development of Direct Use Application by BPPT
PDF: Development of Direct Use Application by BPPT (1549KB)
-
Suyanto, Taufan Surana, Jatmiko Prio Atmojo, and Bambang Teguh Prasetyo
·
World Geothermal Congress
·
2010
·28. Direct Use
The Wayang Windu power plant in West Jawa, Indonesia, has been producing power since June 2000 and is currently delivering 220 MW of electricity into the national grid. The plant is operated by Magma Nusantara Limited (MNL), which has a Joint Operating …
View paper: Design of a Geothermal Energy Dryer for Tea Withering and Drying in Wayang Windu Geothermal Field
PDF: Design of a Geothermal Energy Dryer for Tea Withering and Drying in Wayang Windu Geothermal Field (2084KB)