Searches title, authors, abstract, keywords and session. Use "quotes" for an exact phrase.
All filled fields must match. Conference and year are added to the filters on the left.
Pelitabaru Pakpahan, Ruly Husnie Ridwan, Irwan Edi S. Lubis · World Geothermal Congress · 2010 ·26. Power Generation
The existence of an electricity energy crisis in Indonesia has continued to drive UBP Kamojang efforts to lessen parasitic load at each geothermal power generation unit. The aging of the equipment combined with the increasing demand has forced UBP Kamojang …
View paper: Parasitic Load Efficiency Program Kamojang Generation Business Unit Pt. Indonesia Power, Indonesia PDF: Parasitic Load Efficiency Program Kamojang Generation Business Unit Pt. Indonesia Power, Indonesia (118KB)
R. H. Ridwan, P. Pakpahan, T.A. Fauzi, Khasani, A. M. Zulkarnaen, H. Effendi, A. Nasution · World Geothermal Congress · 2010 ·26. Power Generation
The parasitic load in each power generation plant is always predominated by the parasitic load from Main Cooling Water System (MCWS). In conventional power generation (e.g. coal fired, gas, and combined cycle power plants), sea-water is usually applied as the …
View paper: Automatic Main Cooling Water System (aMCWS) PDF: Automatic Main Cooling Water System (aMCWS) (312KB)