Federico Nietzen
·
World Geothermal Congress
·
2026
·Poster
The Pailas I Generating Unit of the Pailas Geothermal Field (Costa Rica) began commercial production in May 2011, with a net output of 35 MW (binary fluids technology). Over time, a decline in the reinjection capacity of one of the main wells (PGP-25) is …
View paper: Reactivation of a Clogged Reinjection Well by Opening and Putting into Production. Stabilization of Reinjection and Mitigation of the Generation Drop at the Pailas Geothermal Field
PDF: Reactivation of a Clogged Reinjection Well by Opening and Putting into Production. Stabilization of Reinjection and Mitigation of the Generation Drop at the Pailas Geothermal Field (149KB)
-
Federico Nietzen
·
World Geothermal Congress
·
2026
·Poster
The Pailas II Generating Unit at the Pailas Geothermal Field (Costa Rica) began commercial production in August 2020, with a gross output of 55 MW (condensing steam turbine technology). However, just over a year after commissioning, a significant decline in …
View paper: Increasing the Temperature of Geothermal Fluids as a Mitigation Measure against the Formation of Unwanted Solids at the Pailas II Geothermal Field Plant
PDF: Increasing the Temperature of Geothermal Fluids as a Mitigation Measure against the Formation of Unwanted Solids at the Pailas II Geothermal Field Plant (188KB)
-
Osvaldo Vallejos-Ruiz, Jessica Arias-Hernandez, Federico Nietzen-Solano
·
World Geothermal Congress
·
2023
·Other
Electricity generation in Costa Rica is produced mainly from renewable sources, producing mostly over 91% in the last 12 years and over 99% in the last 7 years with clean energy sources. Geothermal plays an important role in this achievement as it continues …
View paper: Costa Rica Country Update Report
PDF: Costa Rica Country Update Report (0,54 MB)
-
Federico NIETZEN, Leonardo SOLIS
·
World Geothermal Congress
·
2020
·Production Engineering, Steam Gathering Systems
The electricity capacity (from the geothermal resource) installed in Costa Rica is approximately 215 MWe in 2018, increased to 270 MWe with the Pailas II Unit by 2019. There are four steam units installed in Dr. Alfredo Mainieri Protti Geothermal Field …
View paper: Production-Injection at the Costa Rica Geothermal Fields 1994 – 2019: Dr. Alfredo Mainieri Protti (Formerly Miravalles) and Pailas
PDF: Production-Injection at the Costa Rica Geothermal Fields 1994 – 2019: Dr. Alfredo Mainieri Protti (Formerly Miravalles) and Pailas (4049 KB)
-
Federico NIETZEN
·
World Geothermal Congress
·
2020
·Corrosion and Scaling
The chemical systems used for the exploitation of producing wells in the Dr. Alfredo Mainieri Protti Geothermal Field (formerly Miravalles Geothermal Field) change over time, according to variations in geothermal fluids. New formulations of inhibitors of …
View paper: Some Aspects Related to Chemicals Systems Used in the Exploitation at the Dr. Alfredo Mainieri Protti Geothermal Field (Formerly Miravalles Geothermal Field), Costa Rica
PDF: Some Aspects Related to Chemicals Systems Used in the Exploitation at the Dr. Alfredo Mainieri Protti Geothermal Field (Formerly Miravalles Geothermal Field), Costa Rica (861 KB)
-
Federico NIETZEN, Leonardo SOLIS
·
Stanford Geothermal Workshop
·
2019
·Production Engineering
The electricity capacity (from the geothermal resource) installed in Costa Rica is approximately 215 MWe in 2018, increased to 270 MWe with the Pailas II Unit by 2019. There are four steam units installed in the Dr. Alfredo Mainieri Protti field (formerly …
View paper: Production-Injection at the Costa Rica Geothermal Fields 1994 – 2018: Dr. Alfredo Mainieri Protti (Formerly Miravalles) and Pailas
PDF: Production-Injection at the Costa Rica Geothermal Fields 1994 – 2018: Dr. Alfredo Mainieri Protti (Formerly Miravalles) and Pailas (5866 KB)
-
Federico NIETZEN
·
Stanford Geothermal Workshop
·
2019
·Production Engineering
The chemical systems used for the exploitation of producing wells in the Dr. Alfredo Mainieri Protti Geothermal Field (formerly Miravalles Geothermal Field) change over time, according to variations in geothermal fluids. New formulations of inhibitors of …
View paper: Some Aspects Related to Chemicals Systems Used in the Exploitation at the Dr. Alfredo Mainieri Protti Geothermal Field (Formerly Miravalles Geothermal Field), Costa Rica
PDF: Some Aspects Related to Chemicals Systems Used in the Exploitation at the Dr. Alfredo Mainieri Protti Geothermal Field (Formerly Miravalles Geothermal Field), Costa Rica (864 KB)
-
Federico NIETZEN, Leonardo SOLIS
·
World Geothermal Congress
·
2015
·Case Histories
There are two fields producing geothermal energy in Costa Rica, Miravalles and Pailas. Miravalles has 4 steam units installed: Unit 1 (55 MWe, 1994), Wellhead Unit (5 MWe, 1995), Unit 2 (55 MWe, 1998) and Unit 3 (29 MWe, 2000), and also a binary plant: Unit 5 …
View paper: Production-Injection at the Costa Rica Geothermal Fields: Miravalles and Pailas
PDF: Production-Injection at the Costa Rica Geothermal Fields: Miravalles and Pailas (2524 KB)
-
Federico NIETZEN
·
World Geothermal Congress
·
2015
·Corrosion and Scaling
The reservoir fluids are over-saturated with respect to calcium carbonate at the flashing zone in most of the Geothermal Field. Without a calcium carbonate inhibition system, the mineral is deposited on the production casing of the well, lost flow (and …
View paper: Chemicals Systems Used in the Exploitation at the Miravalles Geothermal Field, Costa Rica: Calcium Carbonate Inhibition Systems for Neutral Wells and Neutralization Systems for Acid Wells
PDF: Chemicals Systems Used in the Exploitation at the Miravalles Geothermal Field, Costa Rica: Calcium Carbonate Inhibition Systems for Neutral Wells and Neutralization Systems for Acid Wells (609 KB)
-
Federico NIETZEN
·
World Geothermal Congress
·
2015
·Field Management
In the early 90s, a group of people from ICE, from Miravalles volcano zone, Guanacaste, formed a working group designed to operate productive fronts of what it would be someday the Miravalles Geothermal Field. This team will be known later under the name of …
View paper: Operational Considerations in the Process of Exploitation at the Miravalles and Pailas Geothermal Fields: 20 Years of Field Operation
PDF: Operational Considerations in the Process of Exploitation at the Miravalles and Pailas Geothermal Fields: 20 Years of Field Operation (1251 KB)
-
Paul Moya, Federico Nietzen, Sergio Castro and Waldo Taylor
·
Stanford Geothermal Workshop
·
2011
·Reservoir Engineering
The Miravalles Geothermal Field has been producing electric energy since March 1994. It has provided steam for Unit I (55 MW, installed in 1994), a wellhead unit (5 MW, 1995), Unit 2 (55 MW, 1998) and Unit 3 (29 MW, 2000). A 19 MW “bottoming cycle” plant …
View paper: Behavior of the Geothermal Reservoir at the Miravalles Geothermal Field During 1994-2010
PDF: Behavior of the Geothermal Reservoir at the Miravalles Geothermal Field During 1994-2010 (3121KB)
-
Paul Moya, Federico Nietzen
·
World Geothermal Congress
·
2010
·6. Case Histories
The Miravalles Geothermal Field has been producing electric energy since March 1994. It has provided steam for Unit 1 (55 MW, installed in 1994), a wellhead unit (5 MW, 1995), Unit 2 (55 MW, 1998) and Unit 3 (29 MW, 2000). A 19 MW “bottoming cycle” plant …
View paper: Production-Injection at the Miravalles Geothermal Field, Costa Rica
PDF: Production-Injection at the Miravalles Geothermal Field, Costa Rica (2568KB)
-
Federico Nietzen
·
World Geothermal Congress
·
2010
·25. Production Engineering and Steam Gathering Systems
There are 7 separation stations at the Miravalles Geothermal Field (Costa Rica). Each station is fed by 3 or more producing wells. It is possible to determine a wells production curve on line, if steam and water flow from the separation station are analyze. …
View paper: On Line Determination of Production Curves of Producing Geothermal Wells, from Separation Station Flow Data Where Several Wells Converge (Miravalles Geothermal Field)
PDF: On Line Determination of Production Curves of Producing Geothermal Wells, from Separation Station Flow Data Where Several Wells Converge (Miravalles Geothermal Field) (1081KB)
-
Paul Moya and Federico Nietzen
·
World Geothermal Congress
·
2010
·27. Corrosion and Scaling
Power generation at the Miravalles geothermal field currently depends on the utilization of 21 systems for inhibition of calcium carbonate scale, as well as 3 acid-neutralization systems, in the field’s production wells. The performance of the inhibition and …
View paper: Performance of Calcium Carbonate Inhibition and Neutralization Systems for Production Wells at the Miravalles Geothermal Field
PDF: Performance of Calcium Carbonate Inhibition and Neutralization Systems for Production Wells at the Miravalles Geothermal Field (1306KB)
-
Paul Moya, Federico Nietzen, Antonio Yock
·
World Geothermal Congress
·
2005
·20. Corrosion and Scaling
The Miravalles Geothermal Field has been producing electric energy since March 1994. It has provided steam for Unit 1 (55 MWe) since 1994, a Wellhead Unit (5 MWe) installed in 1995, Unit 2 (55 MWe) in 1998, Unit 3 (29 MWe) in 2000, and Unit 5 (19 MWe, a …
View paper: Benefits from the Utilization of a Calcium Carbonate Inhibition System for Production Wells at the Miravalles Geothermal Field
PDF: Benefits from the Utilization of a Calcium Carbonate Inhibition System for Production Wells at the Miravalles Geothermal Field (214KB)
-
Paul Moya, Federico Nietzen, Eddy S·nchez-Rivera
·
World Geothermal Congress
·
2005
·20. Corrosion and Scaling
The Miravalles geothermal field has been producing electric energy since March 1994. It has provided steam for Unit 1 (55 MWe) since 1994, a Wellhead Unit (5 MWe) installed in 1995, Unit 2 (55 MWe) in 1998, Unit 3 (29 MWe) in 2000 and also Unit 5 (19 MWe, a …
View paper: Development of the Neutralization System for Production Wells at the Miravalles Geothermal Field
PDF: Development of the Neutralization System for Production Wells at the Miravalles Geothermal Field (290KB)
-
Paul Moya and Federico Nietzen
·
World Geothermal Congress
·
2005
·9. Case Histories
The Miravalles geothermal field has been producing electric energy since March 1994. It has provided steam for Unit 1 (55 MWe) since 1994, a Wellhead Unit (5 MWe) installed in 1995, Unit 2 (55 MWe) in 1998, Unit 3 (29 MWe) in 2000, and also Unit 5 (19 MWe, a …
View paper: First Ten Years of Production at the Miravalles Geothermal Field
PDF: First Ten Years of Production at the Miravalles Geothermal Field (249KB)