-
Richardson, I.; Misa, T.; Mclean, K.; Castillo-Ruiz, N.; Ferguson, A.; Moodabe-Smith, V.; Pearl, D.; Wootton, D.
·
Geothermal Resources Council Transactions
·
2023
·Injection; NCG; Hydrogen sulfide; Effluent abatement; Carbon
View paper: Non-Condensable Gas Reinjection at the Te Huka Geothermal Power Plant
Download unavailable
-
N.C. Ruiz, K. McLean, I. Richardson, T. Misa, A. Ferguson, D.E. Altar, and E. Kaya
·
New Zealand Geothermal Workshop
·
2021
·Session 1.3 - Reservoir Modelling 1
Te Huka power plant is part of the Tauhara geothermal field in Taupo New Zealand. This 24 MWe binary plant started operation in July 2010. With 2 production wells and 2 injection wells it has produced around 209 GWh of electricity per year. As is the case for …
View paper: PASSIVE NCG REINJECTION AT TE HUKA GEOTHERMAL BINARY POWER PLANT
PDF: PASSIVE NCG REINJECTION AT TE HUKA GEOTHERMAL BINARY POWER PLANT (1003KB)
-
T. Misa, K. Harwood, C. Morris
·
New Zealand Geothermal Workshop
·
2020
·Session 5.2 Above Ground Technology 3
Because flash steam is not completely dry after processing in the separation equipment, pipelines and demisters are used to remove the remaining moisture together with condensation formed during transmission. If they are not fully effective, the result is …
View paper: Investigation and Application of Flashing Flow Nozzles to Mitigate Geothermal Turbine Life Reduction at Te Mihi Power Station
PDF: Investigation and Application of Flashing Flow Nozzles to Mitigate Geothermal Turbine Life Reduction at Te Mihi Power Station (253KB)
-
Jamie POTTER, Amol MISAL, Lutfhie AZWAR
·
Stanford Geothermal Workshop
·
2020
·Modeling
The Ngatamariki geothermal field in the Taupo Volcano Zone of New Zealand provides power to a full binary 82 MWe net plant commissioned in 2013. Over its 7 years of production, the plant and production wells have observed stable enthalpy. The field has shown …
View paper: Chloride Model of Ngatamariki Geothermal System
PDF: Chloride Model of Ngatamariki Geothermal System (1342 KB)
-
T. Misa, E. Mroczek
·
New Zealand Geothermal Workshop
·
2017
·Session 5.1: Production
Testing for separation and scrubbing performance was undertaken on Intermediate Pressure (IP) and Low Pressure (LP) steam systems of a geothermal steamfield and power station. Testing was completed at a number of process conditions to determine what operating …
View paper: Testing of cyclone separators and steam pipelines for separation and scrubbing performance
PDF: Testing of cyclone separators and steam pipelines for separation and scrubbing performance (866KB)
-
Karasawa, H., Misawa, S.And Yoshida, S.
·
New Zealand Geothermal Workshop
·
1989
·Reservoir Assessment
The effect of rake angles on the performance of PDC (polycrystalline diamond compact) bits and the performance of a new PDC cutter were investigated by laboratory rock cutting, drilling and durability tests. PDC core bits were designed for field tests based …
View paper: Design of New PDC Bits for Geothermal Well Drilling and Evaluation of Their Performance in a Granite Quarry
PDF: Design of New PDC Bits for Geothermal Well Drilling and Evaluation of Their Performance in a Granite Quarry (562KB)
-
Misawa, S., Karasawa, H., Morita, K., Hayamizu, H.
·
New Zealand Geothermal Workshop
·
1982
·Drilling
The air drilling test facility was manufactured to investigate the drillability of rocks and the life-time of full-scale rock bits at elevated temperature; Bits used for these tests are 9 tungsten carbide inserts tri-cone bits of diameter. The results …
View paper: Laboratory Tests on the Drillability of Rocks and Evaluation of Tri-Cone Bits at Elevated Temperature
PDF: Laboratory Tests on the Drillability of Rocks and Evaluation of Tri-Cone Bits at Elevated Temperature (423KB)