-
D.C. Irwansyah, G. Rifki, V. Agustino, D. Adityatama and H.W. Wiharlan
·
New Zealand Geothermal Workshop
·
2021
One of the considerations during the planning of geothermal drilling is the selection of the well control equipment or Blowout Preventer (BOP). The BOP is used to shut in the well when the first barrier of the drilling operation, drilling mud, cannot …
View paper: GEOTHERMAL WELL CONTROL EQUIPMENT APPLICATION FOR MINING DRILLING IN GEOTHERMAL ENVIRONMENT
PDF: GEOTHERMAL WELL CONTROL EQUIPMENT APPLICATION FOR MINING DRILLING IN GEOTHERMAL ENVIRONMENT (541KB)
-
A. Rachmadani, F. Muhammad, R.C. Putri, P.V. Prasetyo, D. Irwansyah, B.O. Lakaseru, C. Cathenay
·
New Zealand Geothermal Workshop
·
2021
Flores island is located in eastern Indonesia and part of East Nusa Tenggara province. Known with the big potential geothermal reserve that spread in the 17 locations with approximately 402.5 MWe and 527 MWe reserve backup. According the big potential …
View paper: SELECTING THE MOST POTENTIAL GEOTHERMAL DIRECT USE IN EASTERN INDONESIA, FLORES ISLAND, MATALOKO
PDF: SELECTING THE MOST POTENTIAL GEOTHERMAL DIRECT USE IN EASTERN INDONESIA, FLORES ISLAND, MATALOKO (606KB)
-
R. Putri, F. Ranti, G. Rifki, F. Fadilah, A. Rachmadani and D. Irwansyah
·
New Zealand Geothermal Workshop
·
2021
In the development of geothermal projects, one of main thing that has the greatest level of challenge and high costs are drilling operations. Drilling operations planning must be carried out properly and precisely so that the well can be completed effectively …
View paper: GEOTHERMAL DRILLING PERFORMANCE IMPROVEMENT THROUGH A COMPREHENSIVE NON-PRODUCTIVE TIME ANALYSIS
PDF: GEOTHERMAL DRILLING PERFORMANCE IMPROVEMENT THROUGH A COMPREHENSIVE NON-PRODUCTIVE TIME ANALYSIS (447KB)
-
Annisa RACHMADANI, Reifandi REDHIZA, Didin Chaerudin IRWANSYAH, Pradana Vian PRASETYO, Dicky ALAMSYAH, Daniel W. ADITYATAMA
·
Stanford Geothermal Workshop
·
2021
·Drilling
Exploration phase comes with an objective to prove the presence of a geothermal system underneath the earth surface. The resource proving process can only be confirmed by conducting drilling activity. Several alternative well sizes that are known in …
View paper: Full Coring Drilling Operation Analysis to Improve the Exploration Drilling Performance of Geothermal Slimhole
PDF: Full Coring Drilling Operation Analysis to Improve the Exploration Drilling Performance of Geothermal Slimhole (1073 KB)
-
A. Rachmadani, R. Kusumawardani, G.P. Rizkiani, R. Redhiza, D.C. Irwansyah, K.D. Yasa, S. Nainggolan and N.F. Rozi
·
New Zealand Geothermal Workshop
·
2020
·Session 8.3
Drilling is one of the most cost-intensive activities in a geothermal project. The longer it takes to drill a well, the more expensive the well becomes. It is therefore important to optimize the time spent in drilling to optimize the cost of a well. The …
View paper: A Non-Productive Time Analysis from Geothermal Drilling Campaign in West Java to Improve Future Drilling Planning
PDF: A Non-Productive Time Analysis from Geothermal Drilling Campaign in West Java to Improve Future Drilling Planning (211KB)