-
Nursanty Elisabeth Banjarnahor, Guðrún Sævarsdóttir María Sigríður Guðjónsdóttir
·
World Geothermal Congress
·
2026
·Next Generation Research and Development Facilities
This paper elaborates on the design phase of GEOLAB, which is part of the geothermal park at the Hellisheiði geothermal field in Iceland. This lab offers significant advantages over both laboratory-scale and field-scale setups due to factors such as the …
View paper: The design of the geothermal laboratory (GEOLAB) at Hellisheiði Geothermal Park
PDF: The design of the geothermal laboratory (GEOLAB) at Hellisheiði Geothermal Park
-
Adika BAGASKARA, M. Rizqi AL ASYARI, Daniel W. ADITYATAMA, Dorman PURBA, A. Haykal AHMAD, A. Rizky PRATAMA, Nursanty E. BANJARNAHOR, Agung W. MUKTI
·
Stanford Geothermal Workshop
·
2023
·Direct Use
Geothermal energy can be utilized for other direct use applications such as bathing, heating, drying agriculture products, and tourism objects. As one of the countries with vast geothermal energy potential, Indonesia can take advantage of its geothermal …
View paper: Exploring New Ideas to Improve Geothermal Direct Use in Indonesia
PDF: Exploring New Ideas to Improve Geothermal Direct Use in Indonesia (1090 KB)
-
Nursanty Elisabeth Banjarnahor, Agung Wisnu Mukti, Phil Lory, Geir Þórólfsson, Fríða Ómarsdóttir
·
World Geothermal Congress
·
2023
·Power Generation
Dieng geothermal field located at Central Java, Indonesia, operated by PT Geo Dipa Energi (Persero) with existing power plant Unit 1 commissioned since 2002 of 60 MW and a complementary small-scale plant commissioned since 2021 of 10 MW. As a continuation, …
View paper: STUDY ON POWER PLANT CONFIGURATIONS TO OPTIMIZE MASS FLOW CONSUMPTION WITH RESPECT TO SILICA SCALING FOR DIENG UNIT 2, INDONESIA
PDF: STUDY ON POWER PLANT CONFIGURATIONS TO OPTIMIZE MASS FLOW CONSUMPTION WITH RESPECT TO SILICA SCALING FOR DIENG UNIT 2, INDONESIA (1,92 MB)
-
N.E. Banjarnahor, I.A. Elfajrie, A.A. Ahmad, F.H. Baragbah, Y.B.A. Nugroho and J. Hendrarsakti
·
New Zealand Geothermal Workshop
·
2017
·Session 4.3: Other
This paper summarizes the research projects on geothermal power plant (GPP) that have been performed by Institut Teknologi Bandung (ITB) students at the undergraduate and postgraduate level. The researches were derived from the geothermal engineering master …
View paper: INSTITUT TEKNOLOGI BANDUNG (ITB) CONTRIBUTION IN RESEARCH OF GEOTHERMAL POWER PLANTS SYSTEM OPTIMIZATION IN INDONESIA
PDF: INSTITUT TEKNOLOGI BANDUNG (ITB) CONTRIBUTION IN RESEARCH OF GEOTHERMAL POWER PLANTS SYSTEM OPTIMIZATION IN INDONESIA (321KB)
-
Nursanty BANJARNAHOR, Y.B. Agastyo NUGROHO, Jooned HENDRARSAKTI, Prihadi DARMANTO
·
Stanford Geothermal Workshop
·
2017
·Direct Use
The energy from the brine at Wayang Windu geothermal power plant that is coming from the separator can still be utilized prior to reinjection. Tapped brine at 3.33 kg/s flow rate and 149 oC at output system will flow to cascading system consisting of several …
View paper: Study on Cascaded Direct Use Application Using Geothermal Fluids in Wayang Windu Field
PDF: Study on Cascaded Direct Use Application Using Geothermal Fluids in Wayang Windu Field (392 KB)