Title The Reinjection of Kizildere Geothermal Area, Reinjection Works and Doing Necessity
Authors Mebrure Dunya and Huseyin Dunya
Year 2010
Conference World Geothermal Congress
Keywords Kizildere, reinjection, R-2
Abstract As of January 2009 the geothermal field Kızıldere had 25 deep wells and 108 gradient wells. Some of them cannot be used. A portion are observation wells, and one is used for re-injection. Nine production wells feed the power plant. In the case of the R-3 well, test work has been completed after making a connection to participate in production. In previous years, production was done from the KD-20 well, and waste water was injected in the KD-7 well. This study was of less than 1 month. Other wells were abandoned for affecting the other wells quickly and for other reasons. In 2002, the KD14, 15,16 and 20 were connected at a separator, output water was collected in a main line, and a 405 t/h flow rate re-injection was accomplished. Over a long period the re-injection flow rate was 230-250 t / h, and 30 kg tracer have been used and monitored for 6 months in the other wells. In this study, re-injection at Kizildere field work, and do the work that needs to be done by re-injection, and then started reinjection in 2002 began to change in the field observations are given.
Back to Results Download File