Record Details

Title Main Results and Further Research Work at HDR-Testsite of Urach Spa Development of a HDR Demonstration Pilot-Plant
Authors Helmut Tenzer, Ulrich Schanz, Glen Homeier
Year 2003
Conference International Summer School
Keywords
Abstract The first phase of the Hot Dry Rock (HDR) Project in Urach Spa begann in 1977/78 with the Urach 3 drilling hole. A depth of 3334 m within a metamorphic gneiss rock was achieved. An extension of the drill hole to 3488 m depth followed in a second phase in the year 1982/83, where a temperature of 147
Back to Results Download File