| Title | Geothermal Doublets Munich Riem and Pullach I. Isartal in Comparison: Geological and Drilling Concepts for Minimizing the Geological Risk in the Deep Malm Aquifer |
|---|---|
| Authors | A. Schubert; R. Höferle; F. Böhm |
| Year | 2007 |
| Conference | European Geothermal Conference |
| Keywords | |
| Abstract | In 2003, the geothermal doublet Munich Riem for the Munich public utility company (Stadtwerke Muenchen GmbH) was successfully completed at the eastern edge of the Munich-Riem fairgrounds. This was followed in the winter/spring 2004 by the successfully drilled well Unterhaching GT1 for the municipality Unterhaching. Finally, after the municipality Pullach i. Isartal decided in the summer of 2004 to go forward with the Pullach geothermal project, the geothermal doublet in Pullach was successfully drilled in the summer of 2005 (Fig. 1). |