Record Details

Title Significants Improvement in the 2018-2019 Wayang Windu Drilling Campaign
Authors Redha Bhawika PUTRA, Tommy SOUVANIR, Edyson PURBA, Muhammad IRFAN, Doddy DARMAWAN
Year 2020
Conference World Geothermal Congress
Keywords Wayang Windu, drilling performance
Abstract Star Energy Geothermal (SEG) has just finished its 2018-2019 Wayang Windu Make-up Well Drilling Campaign. A comparison with the 2015-2016 Drilling Campaign indicates that the recent campaign has better drilling performance in terms of drilling days (32 % improvement in ft./day) and drilling cost (40% improvement in $/day) while also meeting the production target. A key factor that contributed to the above performance is the reduction of stuck pipe incidents, especially that the Wayang Windu reservoir has multiple layers of a very reactive clayey formation. Another factor that contributed to the better performance is the ability to monitor in real-time the drilling parameters enabled making quick decisions to prevent the stuck pipe incidents and other untoward incidents. An in-house Drilling & Completions (D&C) Team enabled sharing of information, Best Practices, and Lessons Learned in drilling SEG’s three geothermal assets. In addition, the in-house D&C Team allowed the use of an Integrated Drilling Service (IDS) Contract with two separate big sub-contracts, namely, drilling rig and services for better cost monitoring and avoidance of double handling cost and payment of taxes.
Back to Results Download File