| Title | Tarawera Ormat Installation. Unattended Modular Geothermal Power Plant Performance Report |
|---|---|
| Authors | G. Tilson, U. Levin, and H. Legmann |
| Year | 1990 |
| Conference | New Zealand Geothermal Workshop |
| Keywords | |
| Abstract | In the following report, the authors focus their attention on the of the Tarawera Ormat Installation Power Plant. This review is based on information gathered through the remote monitoring and diagnostic system and on infomation supplied by the power plant operatorsduring a period of severalmonths. In the first part of this review, the actual performanceof the power plant will be compared with the design point performance. In the second part, the achieved performance and the remote monitoring capacity will be described and analyzed. |