| Title | Technical and Economical Analysis of 5 and 30 MWe for Meshkin-Shahr Geothermal Power Plant |
|---|---|
| Authors | Sohail PORKHIAL, Mohsen TAGHADDOSI |
| Year | 2015 |
| Conference | World Geothermal Congress |
| Keywords | technical, economical, Meshkin-Shahr, power plant, Iran |
| Abstract | 11 wells have been drilled in Meshkin-Shahr near Sabalan montain in north-west of Iran. The 7 wells are production, 2 wells are reinjection and 2 wells are out of reservoir. . According to the well test the mass flow of the wells are 30-70 kg/s and the temperature are 130-170`C. In this report, technical and economical possibility of geothermal power plants for 5 or 30 MWe will be calculated. |