| Abstract |
The conceptual model of binary cycle power plant for Jaboi geothermal field is proposed. The evaporator pressure and geothermal fluid flow rate is optimized. The geothermal fluid inlet temperature is estimated 200°C and injection temperature is calculated 80.68°C. The analysis shows to produce 3 MW net power output electricity, it is required 95 kg/s geothermal flow rate. The evaporation pressure of secondary working fluid is optimized at 1700 kPa, which yield the maximum net power output production. |