Title Modeling and Observations of the Enthalpy, Pressure, Chloride, CO2 and Vertical Deformation Transient Change in the Mutnovsky Geothermal Field (Kamchatka, Russia)
Authors Alexey KIRYUKHIN, Olga MIROSHNIK, M.A. MAGUSKIN, I.F. DELEMEN
Year 2013
Conference Stanford Geothermal Workshop
Keywords Mutnovsky, modeling, exploitation, iTOUGH2, EOS1, EOS2
Abstract A TOUGH2-EOS1 3D rectangular numerical model of the Mutnovsky geothermal field (Kiryukhin, 1996) was re-calibrated using natural state and history exploitation data during the time period 1984-2006 years. Recalibration using iTOUGH2-EOS1+tracer inversion modeling capabilities, was useful to remove outliers from calibration data, identify sets of the estimated parameters of the model, and perform estimations. Chloride ion was used as a “tracer” in this modeling. Thermal hydrodynamic observational data which were used for model recalibration are as follows: 37 temperature and 1 pressure calibration points - for natural state, 13 production wells with monthly averaged enthalpies (650 values during the time period 1983-1987, 2000-2006 years) and 1 transient pressure monitoring wells (57 values during 2003-2006 years) - for exploitation history match. Chemical observational data includes transient mass chloride concentrations from 10 production wells and chloride hot spring sampling data (149 values during 1999-2006 years). The following features of Mutnovsky geothermal reservoir based on integrated inverse modeling analysis of natural state and exploitation data were estimated and better understood: 1. Reservoir permeability was found to be one order more comparable to model-1996, especially the lower part coinciding with intrusion contact zone (600-800 mD at -750 - -1250 masl); 2. Local meteoric inflow in the central part of the field accounting for 45 - 80 kg/s since year 2002; 3. Reinjection rates were estimated significantly lower, than officially reported as 100% of total fluid withdrawal; 4. Upflow fluid flows were estimated hotter (314oC) and the rates are larger (+50%), than assumed before; 5. Global double porosity parameters estimates are: fracture spacing – 5 - 10 m, void fraction N 10-3; 6. Main upflow zone chloride mass concentration estimate is 150 ppm. Direct TOUGH2-EOS2 run was also used to verify transient CO2 change in two steam dominated wells.
Back to Results Download File