Title Modular Design and Construction at the Bear Canyon 20 MW Power Plant
Authors Phair, Kenneth A.
Year 1989
Conference Geothermal Resources Council Transactions
Keywords Power Generation; USA; California; Lake; The Geysers; Power Plant Design; Components; Economics; Modules; Critical Path; Scheduling
Abstract The Bear Canyon 20 MW Power Plant was designed around numerous modular equipment packages. This modular concept resulted in significant schedule savings in design, construction, and startup. The use of modular equipment contributed to the completion of the project more than 4 months ahead of schedule.