Record Details

Title Roosevelt Hot Springs Unit Development: A Case History
Authors Kerna, M. J.; Allen, T. S.
Year 1984
Conference Geothermal Resources Council Transactions
Keywords Power Generation; Production; Exploration; USA; Utah; Beaver; Roosevelt Hot Spring; Design; Single Flash; Gathering Systems; Geology; Phillips Petroleum Co
Abstract The Roosevelt Hot Springs Unit (RHSU) was unitized in April 1976 and was the first geothermal unit approved by the United States Department of the Interior. At the time, Phillips Petroleum Company was named unit operator. In the fall of 1980, after an extensive reservoir testing and marketing effort, a contract with Utah Power and Light (UP&L) was executed for the sale of steam to produce 120 MW of electricity. Design of the first 20 MW geothermal power plant began immediately and construction ensued in August of 1982. The startup of the 20 MW geothermal power plant occurred in April 1984. The following RHSU case history presentation includes a geological description, exploration review, testing and data collection, resource and reservoir evaluation, and the 20 MW geothermal power plants.
Back to Results Download File