Record Details

Title Brief Commentaries of the Generation in the Main Plant in Cerro Prieto
Authors Dominguez A., Bernardo
Year 1981
Conference Geothermal Resources Council Transactions
Keywords Production; Exploration; Mexico; Cerro Prieto; Field Management; Geology; MWe; Operating Design; Flash Plants; Wells; Low Pressure; Maintenance
Abstract The generation of 75,000 Kw, with turbines 1 and 2, of 37,500 Kw, for each one, started in the years 1973, with excellent results, that for 1979, the capacity of the Main Plants was increased, with the turbines 3 and 4, similar to the first ones, reaching the total of 150,000 Kw, for this year turbine number 5 should enter the system of low pressure which would generated 30,000 Kw or more.
Back to Results Download File